IAC logo
IAC Assessment: ME0126
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ME0126
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Maine
Assessment Year 1994
Principal Product Carbon fiber composites
NAICS n/a
SIC 3764 - Space Propulsion Units And Parts
Sales $10,000,000-$50,000,000
# of Employees 150
Plant Area (Sq.Ft.) 123,000
Annual Production 150 Pieces
Production Hrs. Annual 8,400
Location (State) ME
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $518,936 6,024,326 kWh $0.09
Natural Gas $202,968 34,146 MMBtu $5.94
Fuel Oil #2 $28,112 5,378 MMBtu $5.23
TOTAL ENERGY COSTS $750,016
RECOMMENDED SAVINGS* $110,619 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Fuel Oil #2 Electricity Usage Natural Gas Fuel Oil #2
$ kWh $ MMBtu $ MMBtu
01: 2.2426 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR Savings:
$25,970
Cost:
$68,000
- - - - $25,970 5,322 -
-
kWh
-
-
MMBtu
$25,970
5,322
MMBtu
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$364
Cost:
$811
$524 6,155 $(-160) (-27) - - $524
6,155
kWh
$(-160)
(-27)
MMBtu
-
-
MMBtu
03: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$11,087
Cost:
$6,000
$11,087 130,129 - - - - $11,087
130,129
kWh
-
-
MMBtu
-
-
MMBtu
04: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$288
Cost:
$75
- - $288 64 - - -
-
kWh
$288
64
MMBtu
-
-
MMBtu
05: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$1,030
Cost:
$50
$1,030 12,016 - - - - $1,030
12,016
kWh
-
-
MMBtu
-
-
MMBtu
06: 2.3416 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST Savings:
$58,800
Cost:
$120,000
$249,900 2,939,918 - - $(-191,100) (-10,031) $249,900
2,939,918
kWh
-
-
MMBtu
$(-191,100)
(-10,031)
MMBtu
07: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$13,080
Cost:
$15,000
$19,830 233,294 $(-6,750) (-796) - - $19,830
233,294
kWh
$(-6,750)
(-796)
MMBtu
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$110,619
Cost:
$209,936
$282,371 3,321,512 $(-6,622) (-759) $(-165,130) (-4,709) $282,371
3,321,512
kWh
$(-6,622)
(-759)
MMBtu
$(-165,130)
(-4,709)
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
MMBtu
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu $ MMBtu
Electricity Usage Natural Gas Fuel Oil #2 Electricity Usage Natural Gas Fuel Oil #2