IAC logo
IAC Assessment: ME0132
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ME0132
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Maine
Assessment Year 1994
Principal Product Women's Shoes
NAICS n/a
SIC 3144 - Women's Footwear, Except Athletic
Sales $10,000,000-$50,000,000
# of Employees 310
Plant Area (Sq.Ft.) 75,000
Annual Production 6,500,000 Pieces
Production Hrs. Annual 2,000
Location (State) ME
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $155,950 1,418,230 kWh $0.11
Fuel Oil #4 $24,340 5,951 MMBtu $4.09
TOTAL ENERGY COSTS $180,290
RECOMMENDED SAVINGS* $12,630 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,750
#|Description Savings
Cost
Status Electricity Usage Fuel Oil #4 Electricity Usage Fuel Oil #4
$ kWh $ MMBtu
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,797
Cost:
$300
$1,797 16,120 - - $1,797
16,120
kWh
-
-
MMBtu
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$363
Cost:
$175
$363 2,931 - - $363
2,931
kWh
-
-
MMBtu
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,625
Cost:
$5,100
- - $1,625 397 -
-
kWh
$1,625
397
MMBtu
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,931
Cost:
$500
$1,931 25,791 - - $1,931
25,791
kWh
-
-
MMBtu
05: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$792
Cost:
-
$792 7,034 - - $792
7,034
kWh
-
-
MMBtu
06: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$944
Cost:
$400
- - $944 232 -
-
kWh
$944
232
MMBtu
07: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$286
Cost:
$75
- - $286 70 -
-
kWh
$286
70
MMBtu
08: 2.3522 INCREASE ELECTRICAL CONDUCTOR SIZE TO REDUCE DISTRIBUTION LOSSES Savings:
$4,892
Cost:
$1,200
$4,892 81,477 - - $4,892
81,477
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$12,630
Cost:
$7,750
$9,775 133,353 $2,855 699 $9,775
133,353
kWh
$2,855
699
MMBtu
TOTAL IMPLEMENTED Savings:
$5,750
Cost:
$1,275
$4,520 48,945 $1,230 302 $4,520
48,945
kWh
$1,230
302
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Fuel Oil #4 Electricity Usage Fuel Oil #4