IAC logo
IAC Assessment: ME0143
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ME0143
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Maine
Assessment Year 1994
Principal Product Woolen fiber
NAICS n/a
SIC 2231 - Broadwoven Fabric Mills, Wool
Sales $10,000,000-$50,000,000
# of Employees 300
Plant Area (Sq.Ft.) 140,000
Annual Production 18,000,000 Pounds
Production Hrs. Annual 6,000
Location (State) ME
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $723,958 8,692,263 kWh $0.08
LPG $5,643 922 MMBtu $6.12
Fuel Oil #2 $9,402 1,434 MMBtu $6.56
Fuel Oil #6 $15,985 4,706 MMBtu $3.40
TOTAL ENERGY COSTS $754,988
RECOMMENDED SAVINGS* $19,636 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,385
#|Description Savings
Cost
Status Electricity Usage Fuel Oil #6 Administrative Changes Electricity Usage Fuel Oil #6 Administrative Changes
$ kWh $ MMBtu $ $
01: 4.231 PURCHASE EQUIPMENT INSTEAD OF LEASING Savings:
$8,107
Cost:
$28,250
- - - - $8,107 - -
-
kWh
-
-
MMBtu
$8,107
-
$
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,490
Cost:
$250
$2,490 29,601 - - - - $2,490
29,601
kWh
-
-
MMBtu
-
-
$
03: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$2,350
Cost:
$240
$2,350 28,136 - - - - $2,350
28,136
kWh
-
-
MMBtu
-
-
$
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,174
Cost:
$1,650
$2,174 26,084 - - - - $2,174
26,084
kWh
-
-
MMBtu
-
-
$
05: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$1,333
Cost:
$1,768
$1,614 16,120 $(-281) (-66) - - $1,614
16,120
kWh
$(-281)
(-66)
MMBtu
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,622
Cost:
$800
$1,622 19,343 - - - - $1,622
19,343
kWh
-
-
MMBtu
-
-
$
07: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$590
Cost:
$800
$590 7,034 - - - - $590
7,034
kWh
-
-
MMBtu
-
-
$
08: 2.2511 INSULATE BARE EQUIPMENT Savings:
$970
Cost:
$1,884
$970 43,376 - - - - $970
43,376
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$19,636
Cost:
$35,642
$11,810 169,694 $(-281) (-66) $8,107 - $11,810
169,694
kWh
$(-281)
(-66)
MMBtu
$8,107
-
$
TOTAL IMPLEMENTED Savings:
$8,385
Cost:
$3,858
$8,666 100,234 $(-281) (-66) - - $8,666
100,234
kWh
$(-281)
(-66)
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Fuel Oil #6 Administrative Changes Electricity Usage Fuel Oil #6 Administrative Changes