IAC logo
IAC Assessment: ME0165
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ME0165
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Maine
Assessment Year 1995
Principal Product Stainless Steel fabrications
NAICS n/a
SIC 3441 - Fabricated Structural Metal
Sales $10,000,000-$50,000,000
# of Employees 130
Plant Area (Sq.Ft.) 90,000
Annual Production 2,500,000 Pounds
Production Hrs. Annual 2,210
Location (State) ME
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $106,198 972,743 kWh $0.11
LPG $58,721 6,683 MMBtu $8.79
TOTAL ENERGY COSTS $169,859
RECOMMENDED SAVINGS* $12,261 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,826
#|Description Savings
Cost
Status Electricity Usage Solid Waste (non-haz) Gaseous Waste Administrative Changes Electricity Usage Solid Waste (non-haz) Gaseous Waste Administrative Changes
$ kWh $ lb $ lb $ $
01: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$3,151
Cost:
-
- - - - - - $3,151 - -
-
kWh
-
-
lb
-
-
lb
$3,151
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,438
Cost:
$420
$1,438 10,844 - - - - - - $1,438
10,844
kWh
-
-
lb
-
-
lb
-
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$879
Cost:
$300
$879 13,482 - - - - - - $879
13,482
kWh
-
-
lb
-
-
lb
-
-
$
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$511
Cost:
$1,600
$511 8,792 - - - - - - $511
8,792
kWh
-
-
lb
-
-
lb
-
-
$
05: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$455
Cost:
-
- - - - - - $455 - -
-
kWh
-
-
lb
-
-
lb
$455
-
$
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$435
Cost:
$930
$435 5,275 - - - - - - $435
5,275
kWh
-
-
lb
-
-
lb
-
-
$
07: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$252
Cost:
$97
$252 2,931 - - - - - - $252
2,931
kWh
-
-
lb
-
-
lb
-
-
$
08: 2.6125 KEEP EQUIPMENT CLEAN Savings:
$200
Cost:
$150
$200 2,052 - - - - - - $200
2,052
kWh
-
-
lb
-
-
lb
-
-
$
09: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,940
Cost:
$300
- - - - $2,940 48,000 - - -
-
kWh
-
-
lb
$2,940
48,000
lb
-
-
$
10: 3.6125 SELL COMBUSTIBLE WASTE Savings:
$2,000
Cost:
-
- - $2,000 28 - - - - -
-
kWh
$2,000
28
lb
-
-
lb
-
-
$
TOTAL RECOMMENDED Savings:
$12,261
Cost:
$3,797
$3,715 43,376 $2,000 28 $2,940 48,000 $3,606 - $3,715
43,376
kWh
$2,000
28
lb
$2,940
48,000
lb
$3,606
-
$
TOTAL IMPLEMENTED Savings:
$9,826
Cost:
$2,867
$3,280 38,101 - - $2,940 48,000 $3,606 - $3,280
38,101
kWh
-
-
lb
$2,940
48,000
lb
$3,606
-
$
Savings
Cost
$ kWh $ lb $ lb $ $
Electricity Usage Solid Waste (non-haz) Gaseous Waste Administrative Changes Electricity Usage Solid Waste (non-haz) Gaseous Waste Administrative Changes