IAC Assessment: ME0177
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ME0177
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Maine
Assessment Year 1996
Principal Product Shoes
NAICS n/a
SIC 3143 - Men's Footwear, Except Athletic
Sales $10,000,000-$50,000,000
# of Employees 155
Plant Area (Sq.Ft.) 31,250
Annual Production 328,000 Pieces
Production Hrs. Annual 2,500
Location (State) ME
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $45,823 655,041 kWh $0.07
Electricity Demand $26,951 2,148 kW-months/year $12.55
Electricity Fees $2,281 - $ -
Fuel Oil #2 $7,943 1,751 MMBtu $4.54
TOTAL ENERGY COSTS $82,998
RECOMMENDED SAVINGS* $10,754 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,974
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Fuel Oil #2 Electricity Usage Electricity Demand Natural Gas Fuel Oil #2
$ kWh $ kW-months/year $ MMBtu $ MMBtu
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$5,845
Cost:
$10,000
$2,620 37,222 $4,579 540 $(-1,354) (-158) - - $2,620
37,222
kWh
$4,579
540
kW-months/year
$(-1,354)
(-158)
MMBtu
-
-
MMBtu
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$1,749
Cost:
$5,000
$1,575 22,274 $636 75 - - $(-462) (-102) $1,575
22,274
kWh
$636
75
kW-months/year
-
-
MMBtu
$(-462)
(-102)
MMBtu
03: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$1,186
Cost:
$600
- - - - - - $1,186 195 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,186
195
MMBtu
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$835
Cost:
$371
$835 12,016 - - - - - - $835
12,016
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$754
Cost:
$300
$754 8,499 - - - - - - $754
8,499
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$385
Cost:
$750
$385 5,569 - - - - - - $385
5,569
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$10,754
Cost:
$17,021
$6,169 85,580 $5,215 615 $(-1,354) (-158) $724 93 $6,169
85,580
kWh
$5,215
615
kW-months/year
$(-1,354)
(-158)
MMBtu
$724
93
MMBtu
TOTAL IMPLEMENTED Savings:
$1,974
Cost:
$1,421
$1,974 26,084 - - - - - - $1,974
26,084
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu
Electricity Usage Electricity Demand Natural Gas Fuel Oil #2 Electricity Usage Electricity Demand Natural Gas Fuel Oil #2