Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Maine |
---|---|
Assessment Year | 1997 |
Principal Product | Regulators |
NAICS | n/a |
SIC | 3612 - Transformers, Except Electronic |
Sales | $10,000,000-$50,000,000 |
# of Employees | 250 |
Plant Area (Sq.Ft.) | 110,000 |
Annual Production | 3,250,000 Pounds |
Production Hrs. Annual | 4,250 |
Location (State) | ME |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $299,442 | 3,032,825 | kWh | $0.10 |
Electricity Demand | $76,452 | 13,137 | kW-months/year | $5.82 |
Electricity Fees | $2,733 | - | $ | - |
LPG | $25,084 | 3,332 | MMBtu | $7.53 |
TOTAL ENERGY COSTS | $405,271 | |||
RECOMMENDED SAVINGS* | $41,616 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | LPG | Other Liquid (non-haz) | Solid Waste (haz) | Administrative Changes | Water Consumption | Electricity Usage | LPG | Other Liquid (non-haz) | Solid Waste (haz) | Administrative Changes | Water Consumption | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | gal | $ | lb | $ | $ | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $4,092 Cost: $1,000 |
- | - | $4,092 | 604 | - | - | - | - | - | - | - | - |
- - kWh |
$4,092 604 MMBtu |
- - gal |
- - lb |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $2,316 Cost: $500 |
$2,316 | 33,118 | - | - | - | - | - | - | - | - | - | - |
$2,316 33,118 kWh |
- - MMBtu |
- - gal |
- - lb |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $759 Cost: $400 |
- | - | $759 | 101 | - | - | - | - | - | - | - | - |
- - kWh |
$759 101 MMBtu |
- - gal |
- - lb |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.8123 PAY UTILITY BILLS ON TIME |
Savings: $852 Cost: - |
- | - | - | - | - | - | - | - | $852 | - | - | - |
- - kWh |
- - MMBtu |
- - gal |
- - lb |
$852 - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $457 Cost: $763 |
$457 | 6,448 | - | - | - | - | - | - | - | - | - | - |
$457 6,448 kWh |
- - MMBtu |
- - gal |
- - lb |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $370 Cost: $100 |
$370 | 5,275 | - | - | - | - | - | - | - | - | - | - |
$370 5,275 kWh |
- - MMBtu |
- - gal |
- - lb |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.8123 PAY UTILITY BILLS ON TIME |
Savings: $204 Cost: - |
- | - | - | - | - | - | - | - | $204 | - | - | - |
- - kWh |
- - MMBtu |
- - gal |
- - lb |
$204 - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.5146 UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID |
Savings: $25,833 Cost: $24,000 |
- | - | $1,809 | 241 | $24,024 | 1,820 | - | - | - | - | - | - |
- - kWh |
$1,809 241 MMBtu |
$24,024 1,820 gal |
- - lb |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 3.4151 MINIMIZE WATER USAGE |
Savings: $5,685 Cost: $1,400 |
- | - | - | - | - | - | - | - | - | - | $5,685 | - |
- - kWh |
- - MMBtu |
- - gal |
- - lb |
- - $ |
$5,685 - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 3.3131 USE EVAPORATION TO CONCENTRATE MATERIAL |
Savings: $1,048 Cost: $2,000 |
- | - | - | - | - | - | $1,048 | 1,673 | - | - | - | - |
- - kWh |
- - MMBtu |
- - gal |
$1,048 1,673 lb |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 4.212 ADOPT IN-HOUSE MATERIAL GENERATION |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - | - |
- - kWh |
- - MMBtu |
- - gal |
- - lb |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $41,616 Cost: $30,163 |
$3,143 | 44,841 | $6,660 | 946 | $24,024 | 1,820 | $1,048 | 1,673 | $1,056 | - | $5,685 | - | $3,143 44,841 kWh |
$6,660 946 MMBtu |
$24,024 1,820 gal |
$1,048 1,673 lb |
$1,056 - $ |
$5,685 - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - | - | - - kWh |
- - MMBtu |
- - gal |
- - lb |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | gal | $ | lb | $ | $ | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | LPG | Other Liquid (non-haz) | Solid Waste (haz) | Administrative Changes | Water Consumption | Electricity Usage | LPG | Other Liquid (non-haz) | Solid Waste (haz) | Administrative Changes | Water Consumption |