IAC logo
IAC Assessment: ME0227
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ME0227
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Maine
Assessment Year 1997
Principal Product yachts
NAICS n/a
SIC 3732 - Boat Building And Repairing
Sales $10,000,000-$50,000,000
# of Employees 130
Plant Area (Sq.Ft.) 66,000
Annual Production 60 Pieces
Production Hrs. Annual 2,125
Location (State) ME
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $44,331 582,356 kWh $0.08
Electricity Demand $16,156 1,889 kW-months/year $8.55
Electricity Fees $1,436 - $ -
Fuel Oil #2 $16,781 2,661 MMBtu $6.31
TOTAL ENERGY COSTS $78,704
RECOMMENDED SAVINGS* $10,680 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,968
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Fuel Oil #2 Administrative Changes Primary Raw Material Electricity Usage Electricity Demand Fuel Oil #2 Administrative Changes Primary Raw Material
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$5,383
Cost:
$7,504
$2,921 41,032 $3,540 414 $(-1,078) (-177) - - - - $2,921
41,032
kWh
$3,540
414
kW-months/year
$(-1,078)
(-177)
MMBtu
-
-
$
-
-
$
02: 2.2515 USE OPTIMUM THICKNESS INSULATION Savings:
$790
Cost:
$960
- - - - $790 104 - - - - -
-
kWh
-
-
kW-months/year
$790
104
MMBtu
-
-
$
-
-
$
03: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$756
Cost:
-
- - - - - - $756 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$756
-
$
-
-
$
04: 2.2515 USE OPTIMUM THICKNESS INSULATION Savings:
$515
Cost:
$588
$515 4,689 - - - - - - - - $515
4,689
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
05: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$512
Cost:
-
- - - - - - $512 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$512
-
$
-
-
$
06: 2.2515 USE OPTIMUM THICKNESS INSULATION Savings:
$408
Cost:
$75
$408 5,862 - - - - - - - - $408
5,862
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$359
Cost:
$100
$359 5,275 - - - - - - - - $359
5,275
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$217
Cost:
$185
$217 3,224 - - - - - - - - $217
3,224
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
09: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE Savings:
$1,200
Cost:
-
- - - - - - - - $1,200 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$1,200
-
$
10: 3.2123 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS Savings:
$540
Cost:
$1,188
- - - - - - - - $540 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$540
-
$
TOTAL RECOMMENDED Savings:
$10,680
Cost:
$10,600
$4,420 60,082 $3,540 414 $(-288) (-73) $1,268 - $1,740 - $4,420
60,082
kWh
$3,540
414
kW-months/year
$(-288)
(-73)
MMBtu
$1,268
-
$
$1,740
-
$
TOTAL IMPLEMENTED Savings:
$8,968
Cost:
$10,600
$4,420 60,082 $3,540 414 $(-288) (-73) $756 - $540 - $4,420
60,082
kWh
$3,540
414
kW-months/year
$(-288)
(-73)
MMBtu
$756
-
$
$540
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Fuel Oil #2 Administrative Changes Primary Raw Material Electricity Usage Electricity Demand Fuel Oil #2 Administrative Changes Primary Raw Material