IAC logo
IAC Assessment: ME0247
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ME0247
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Maine
Assessment Year 1998
Principal Product shoes
NAICS n/a
SIC 3144 - Women's Footwear, Except Athletic
Sales $10,000,000-$50,000,000
# of Employees 300
Plant Area (Sq.Ft.) 75,000
Annual Production 1,750,000 Pieces
Production Hrs. Annual 2,500
Location (State) ME
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $111,065 1,545,428 kWh $0.07
Electricity Demand $59,765 6,388 kW-months/year $9.36
Electricity Fees $5,076 - $ -
LPG $559 24 MMBtu $23.29
Fuel Oil #4 $33,548 8,221 MMBtu $4.08
TOTAL ENERGY COSTS $260,976
RECOMMENDED SAVINGS* $92,658 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $89,328
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Fuel Oil #2 Other Liquid (haz) Administrative Changes Electricity Usage Electricity Demand Fuel Oil #2 Other Liquid (haz) Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ gal $ $
01: 4.2120 ADOPT IN-HOUSE MATERIAL GENERATION Savings:
$33,500
Cost:
$25,500
- - - - - - - - $33,500 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
$33,500
-
$
02: 4.2310 PURCHASE EQUIPMENT INSTEAD OF LEASING Savings:
$4,122
Cost:
$16,460
- - - - - - - - $4,122 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
$4,122
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,100
Cost:
$600
$3,100 44,256 - - - - - - - - $3,100
44,256
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
04: 2.4234 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER Savings:
$1,398
Cost:
$500
$1,398 78,253 - - - - - - - - $1,398
78,253
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
05: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$1,102
Cost:
$1,700
$879 9,086 $493 54 $(-270) (-54) - - - - $879
9,086
kWh
$493
54
kW-months/year
$(-270)
(-54)
MMBtu
-
-
gal
-
-
$
06: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$360
Cost:
-
$360 5,275 - - - - - - - - $360
5,275
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
07: 3.2176 INCREASE USE OF AUTOMATION Savings:
$45,746
Cost:
$25,500
- - - - - - $45,746 5,700 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$45,746
5,700
gal
-
-
$
08: 3.2123 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS Savings:
$3,330
Cost:
$1,251
- - - - - - $3,330 385 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$3,330
385
gal
-
-
$
TOTAL RECOMMENDED Savings:
$92,658
Cost:
$71,511
$5,737 136,870 $493 54 $(-270) (-54) $49,076 6,085 $37,622 - $5,737
136,870
kWh
$493
54
kW-months/year
$(-270)
(-54)
MMBtu
$49,076
6,085
gal
$37,622
-
$
TOTAL IMPLEMENTED Savings:
$89,328
Cost:
$70,260
$5,737 136,870 $493 54 $(-270) (-54) $45,746 5,700 $37,622 - $5,737
136,870
kWh
$493
54
kW-months/year
$(-270)
(-54)
MMBtu
$45,746
5,700
gal
$37,622
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ $
Electricity Usage Electricity Demand Fuel Oil #2 Other Liquid (haz) Administrative Changes Electricity Usage Electricity Demand Fuel Oil #2 Other Liquid (haz) Administrative Changes