IAC logo
IAC Assessment: ME0250
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ME0250
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Maine
Assessment Year 1998
Principal Product beer
NAICS n/a
SIC 2082 - Malt Beverages
Sales $1,000,000-$5,000,000
# of Employees 25
Plant Area (Sq.Ft.) 32,000
Annual Production 840,000 Thousand Gallons
Production Hrs. Annual 3,600
Location (State) VT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $25,911 533,705 kWh $0.05
Electricity Demand $20,266 1,447 kW-months/year $14.01
Electricity Fees $3,843 - $ -
Natural Gas $33,085 7,180 MMBtu $4.61
TOTAL ENERGY COSTS $83,105
RECOMMENDED SAVINGS* $58,224 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $58,224
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 4.441 INSTALL AUTOMATIC PACKING EQUIPMENT Savings:
$37,125
Cost:
$1,656
- - - - $37,125 - -
-
kWh
-
-
MMBtu
$37,125
-
$
02: 2.2511 INSULATE BARE EQUIPMENT Savings:
$5,216
Cost:
-
- - $5,216 950 - - -
-
kWh
$5,216
950
MMBtu
-
-
$
03: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$3,849
Cost:
-
- - $3,849 486 - - -
-
kWh
$3,849
486
MMBtu
-
-
$
04: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$3,000
Cost:
$1,000
- - - - $3,000 - -
-
kWh
-
-
MMBtu
$3,000
-
$
05: 2.6232 INSTALL SET-BACK TIMERS Savings:
$2,760
Cost:
$350
- - $2,760 599 - - -
-
kWh
$2,760
599
MMBtu
-
-
$
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$2,390
Cost:
-
- - $2,390 138 - - -
-
kWh
$2,390
138
MMBtu
-
-
$
07: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$1,560
Cost:
$354
- - - - $1,560 - -
-
kWh
-
-
MMBtu
$1,560
-
$
08: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$927
Cost:
$400
$927 64,771 - - - - $927
64,771
kWh
-
-
MMBtu
-
-
$
09: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$540
Cost:
-
$540 7,620 - - - - $540
7,620
kWh
-
-
MMBtu
-
-
$
10: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$430
Cost:
$184
- - - - $430 - -
-
kWh
-
-
MMBtu
$430
-
$
11: 2.2511 INSULATE BARE EQUIPMENT Savings:
$427
Cost:
-
- - $427 74 - - -
-
kWh
$427
74
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$58,224
Cost:
$3,944
$1,467 72,391 $14,642 2,247 $42,115 - $1,467
72,391
kWh
$14,642
2,247
MMBtu
$42,115
-
$
TOTAL IMPLEMENTED Savings:
$58,224
Cost:
$3,944
$1,467 72,391 $14,642 2,247 $42,115 - $1,467
72,391
kWh
$14,642
2,247
MMBtu
$42,115
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes