IAC logo
IAC Assessment: ME0289
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ME0289
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Maine
Assessment Year 2000
Principal Product Fresh atlantic salmon
NAICS n/a
SIC 2092 - Fresh Or Frozen Prepared Fish
Sales $10,000,000-$50,000,000
# of Employees 90
Plant Area (Sq.Ft.) 11,200
Annual Production 10,000,000 Pounds
Production Hrs. Annual 4,625
Location (State) ME
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $115,918 1,091,735 kWh $0.11
Electricity Demand $15,905 2,710 kW-months/year $5.87
LPG $15,164 1,709 MMBtu $8.87
TOTAL ENERGY COSTS $161,049
RECOMMENDED SAVINGS* $86,821 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $12,894
#|Description Savings
Cost
Status Electricity Usage Electricity Demand LPG Fuel Oil #2 Water Disposal Solid Waste (non-haz) Primary Product Electricity Usage Electricity Demand LPG Fuel Oil #2 Water Disposal Solid Waste (non-haz) Primary Product
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ Tgal $ lb $ $
01: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$66,856
Cost:
$175,000
$89,395 983,880 - - $15,159 1,709 $(-52,698) (-10,464) - - - - $15,000 - $89,395
983,880
kWh
-
-
kW-months/year
$15,159
1,709
MMBtu
$(-52,698)
(-10,464)
MMBtu
-
-
Tgal
-
-
lb
$15,000
-
$
02: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$3,387
Cost:
$3,165
- - - - $3,387 328 - - - - - - - - -
-
kWh
-
-
kW-months/year
$3,387
328
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
03: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$3,100
Cost:
$6,600
$2,965 32,532 $1,374 234 $(-1,239) (-139) - - - - - - - - $2,965
32,532
kWh
$1,374
234
kW-months/year
$(-1,239)
(-139)
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
04: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$3,671
Cost:
$5,350
$1,958 21,395 $845 144 $868 98 - - - - - - - - $1,958
21,395
kWh
$845
144
kW-months/year
$868
98
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
05: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$9,507
Cost:
$2,400
$(-273) (-2,931) $(-532) (-60) - - - - - - $10,312 - - - $(-273)
(-2,931)
kWh
$(-532)
(-60)
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
$10,312
-
lb
-
-
$
06: 3.4156 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE Savings:
$300
Cost:
$463
$98 1,172 - - - - - - $202 270,000 - - - - $98
1,172
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
$202
270,000
Tgal
-
-
lb
-
-
$
TOTAL RECOMMENDED Savings:
$86,821
Cost:
$192,978
$94,143 1,036,048 $1,687 318 $18,175 1,996 $(-52,698) (-10,464) $202 270,000 $10,312 - $15,000 - $94,143
1,036,048
kWh
$1,687
318
kW-months/year
$18,175
1,996
MMBtu
$(-52,698)
(-10,464)
MMBtu
$202
270,000
Tgal
$10,312
-
lb
$15,000
-
$
TOTAL IMPLEMENTED Savings:
$12,894
Cost:
$5,565
$(-273) (-2,931) $(-532) (-60) $3,387 328 - - - - $10,312 - - - $(-273)
(-2,931)
kWh
$(-532)
(-60)
kW-months/year
$3,387
328
MMBtu
-
-
MMBtu
-
-
Tgal
$10,312
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ Tgal $ lb $ $
Electricity Usage Electricity Demand LPG Fuel Oil #2 Water Disposal Solid Waste (non-haz) Primary Product Electricity Usage Electricity Demand LPG Fuel Oil #2 Water Disposal Solid Waste (non-haz) Primary Product