Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Maine |
---|---|
Assessment Year | 2000 |
Principal Product | Fresh atlantic salmon |
NAICS | n/a |
SIC | 2092 - Fresh Or Frozen Prepared Fish |
Sales | $10,000,000-$50,000,000 |
# of Employees | 90 |
Plant Area (Sq.Ft.) | 11,200 |
Annual Production | 10,000,000 Pounds |
Production Hrs. Annual | 4,625 |
Location (State) | ME |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $115,918 | 1,091,735 | kWh | $0.11 |
Electricity Demand | $15,905 | 2,710 | kW-months/year | $5.87 |
LPG | $15,164 | 1,709 | MMBtu | $8.87 |
TOTAL ENERGY COSTS | $161,049 | |||
RECOMMENDED SAVINGS* | $86,821 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $12,894 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | LPG | Fuel Oil #2 | Water Disposal | Solid Waste (non-haz) | Primary Product | Electricity Usage | Electricity Demand | LPG | Fuel Oil #2 | Water Disposal | Solid Waste (non-haz) | Primary Product | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | MMBtu | $ | Tgal | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT |
Savings: $66,856 Cost: $175,000 |
$89,395 | 983,880 | - | - | $15,159 | 1,709 | $(-52,698) | (-10,464) | - | - | - | - | $15,000 | - |
$89,395 983,880 kWh |
- - kW-months/year |
$15,159 1,709 MMBtu |
$(-52,698) (-10,464) MMBtu |
- - Tgal |
- - lb |
$15,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $3,387 Cost: $3,165 |
- | - | - | - | $3,387 | 328 | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$3,387 328 MMBtu |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $3,100 Cost: $6,600 |
$2,965 | 32,532 | $1,374 | 234 | $(-1,239) | (-139) | - | - | - | - | - | - | - | - |
$2,965 32,532 kWh |
$1,374 234 kW-months/year |
$(-1,239) (-139) MMBtu |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $3,671 Cost: $5,350 |
$1,958 | 21,395 | $845 | 144 | $868 | 98 | - | - | - | - | - | - | - | - |
$1,958 21,395 kWh |
$845 144 kW-months/year |
$868 98 MMBtu |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS |
Savings: $9,507 Cost: $2,400 |
$(-273) | (-2,931) | $(-532) | (-60) | - | - | - | - | - | - | $10,312 | - | - | - |
$(-273) (-2,931) kWh |
$(-532) (-60) kW-months/year |
- - MMBtu |
- - MMBtu |
- - Tgal |
$10,312 - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.4156 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE |
Savings: $300 Cost: $463 |
$98 | 1,172 | - | - | - | - | - | - | $202 | 270,000 | - | - | - | - |
$98 1,172 kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
$202 270,000 Tgal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $86,821 Cost: $192,978 |
$94,143 | 1,036,048 | $1,687 | 318 | $18,175 | 1,996 | $(-52,698) | (-10,464) | $202 | 270,000 | $10,312 | - | $15,000 | - | $94,143 1,036,048 kWh |
$1,687 318 kW-months/year |
$18,175 1,996 MMBtu |
$(-52,698) (-10,464) MMBtu |
$202 270,000 Tgal |
$10,312 - lb |
$15,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $12,894 Cost: $5,565 |
$(-273) | (-2,931) | $(-532) | (-60) | $3,387 | 328 | - | - | - | - | $10,312 | - | - | - | $(-273) (-2,931) kWh |
$(-532) (-60) kW-months/year |
$3,387 328 MMBtu |
- - MMBtu |
- - Tgal |
$10,312 - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | MMBtu | $ | Tgal | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | LPG | Fuel Oil #2 | Water Disposal | Solid Waste (non-haz) | Primary Product | Electricity Usage | Electricity Demand | LPG | Fuel Oil #2 | Water Disposal | Solid Waste (non-haz) | Primary Product |