IAC logo
IAC Assessment: ME0301
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ME0301
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Maine
Assessment Year 2000
Principal Product Textiles
NAICS n/a
SIC 2299 - Textile Goods, Nec
Sales $10,000,000-$50,000,000
# of Employees 275
Plant Area (Sq.Ft.) 185,000
Annual Production 4,000,000 Pounds
Production Hrs. Annual 6,000
Location (State) ME
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $415,813 5,752,052 kWh $0.07
Electricity Demand $115,252 12,626 kW-months/year $9.13
Electricity Fees $17,069 - $ -
LPG $108,781 13,694 MMBtu $7.94
Fuel Oil #6 $144,146 37,868 MMBtu $3.81
TOTAL ENERGY COSTS $801,061
RECOMMENDED SAVINGS* $69,391 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand LPG Solid Waste (non-haz) Primary Raw Material Electricity Usage Electricity Demand LPG Solid Waste (non-haz) Primary Raw Material
$ kWh $ kW-months/year $ MMBtu $ lb $ $
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$27,427
Cost:
$27,427
$11,059 152,989 $21,693 2,376 $(-5,325) (-614) - - - - $11,059
152,989
kWh
$21,693
2,376
kW-months/year
$(-5,325)
(-614)
MMBtu
-
-
lb
-
-
$
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$12,375
Cost:
$13,500
$20,221 212,192 - - $(-7,846) (-907) - - - - $20,221
212,192
kWh
-
-
kW-months/year
$(-7,846)
(-907)
MMBtu
-
-
lb
-
-
$
03: 2.2427 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS Savings:
$11,743
Cost:
$35,073
- - - - $11,743 1,479 - - - - -
-
kWh
-
-
kW-months/year
$11,743
1,479
MMBtu
-
-
lb
-
-
$
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$5,346
Cost:
$7,200
$5,346 55,979 - - - - - - - - $5,346
55,979
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
05: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$7,500
Cost:
$3,600
- - - - - - $7,500 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$7,500
-
lb
-
-
$
06: 4.131 MODIFY PROCESS TO REDUCE MATERIAL USE/COST Savings:
$5,000
Cost:
$15,000
- - - - - - - - $5,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$5,000
-
$
TOTAL RECOMMENDED Savings:
$69,391
Cost:
$101,800
$36,626 421,160 $21,693 2,376 $(-1,428) (-42) $7,500 - $5,000 - $36,626
421,160
kWh
$21,693
2,376
kW-months/year
$(-1,428)
(-42)
MMBtu
$7,500
-
lb
$5,000
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $
Electricity Usage Electricity Demand LPG Solid Waste (non-haz) Primary Raw Material Electricity Usage Electricity Demand LPG Solid Waste (non-haz) Primary Raw Material