IAC logo
IAC Assessment: MI0002
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MI0002
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Miami
Assessment Year 2001
Principal Product Hollow fiber for artificial kidney
NAICS n/a
SIC 3841 - Surgical And Medical Instruments
Sales $10,000,000-$50,000,000
# of Employees 75
Plant Area (Sq.Ft.) 40,000
Annual Production 42,650,919 Thousand Feet
Production Hrs. Annual 8,400
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $495,715 8,247,642 kWh $0.06
Natural Gas $88,871 15,237 MMBtu $5.83
TOTAL ENERGY COSTS $584,586
RECOMMENDED SAVINGS* $218,777 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Primary Product Electricity Usage Primary Product
$ kWh $ $
01: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$9,063
Cost:
$414
$9,063 150,797 - - $9,063
150,797
kWh
-
-
$
02: 2.4321 UPGRADE OBSOLETE EQUIPMENT Savings:
$22,409
Cost:
$6,500
$22,409 314,496 - - $22,409
314,496
kWh
-
-
$
03: 2.7233 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT Savings:
$30,943
Cost:
$20
$30,943 514,865 - - $30,943
514,865
kWh
-
-
$
04: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$47,000
Cost:
$300
- - $47,000 - -
-
kWh
$47,000
-
$
05: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$4,034
Cost:
$3,531
$4,034 67,123 - - $4,034
67,123
kWh
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,800
Cost:
$35
$1,800 29,950 - - $1,800
29,950
kWh
-
-
$
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$6,119
Cost:
$690
$6,119 101,814 - - $6,119
101,814
kWh
-
-
$
08: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT Savings:
$3,409
Cost:
$20
$3,409 170,446 - - $3,409
170,446
kWh
-
-
$
09: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$94,000
Cost:
$33,124
- - $94,000 - -
-
kWh
$94,000
-
$
TOTAL RECOMMENDED Savings:
$218,777
Cost:
$44,634
$77,777 1,349,491 $141,000 - $77,777
1,349,491
kWh
$141,000
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
$
Savings
Cost
$ kWh $ $
Electricity Usage Primary Product Electricity Usage Primary Product