Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Miami |
---|---|
Assessment Year | 2001 |
Principal Product | Heating equipment |
NAICS | n/a |
SIC | 3433 - Heating Equipment, Except Electric |
Sales | $10,000,000-$50,000,000 |
# of Employees | 124 |
Plant Area (Sq.Ft.) | 105,000 |
Annual Production | 15,000 Pieces |
Production Hrs. Annual | 6,045 |
Location (State) | FL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $53,908 | 991,813 | kWh | $0.05 |
Electricity Demand | $25,000 | 2,064 | kW-months/year | $12.11 |
TOTAL ENERGY COSTS | $78,908 | |||
RECOMMENDED SAVINGS* | $253,518 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Administrative Changes | Primary Raw Material | Primary Product | Electricity Usage | Administrative Changes | Primary Raw Material | Primary Product | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | $ | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED |
Savings: $3,994 Cost: $125 |
$3,994 | 49,921 | - | - | - | - | - | - |
$3,994 49,921 kWh |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS |
Savings: $12,780 Cost: $87 |
$12,780 | 159,749 | - | - | - | - | - | - |
$12,780 159,749 kWh |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA |
Savings: $1,272 Cost: $5 |
$1,272 | 15,897 | - | - | - | - | - | - |
$1,272 15,897 kWh |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 4.322 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL |
Savings: $22,533 Cost: $40 |
- | - | - | - | $22,533 | - | - | - |
- - kWh |
- - $ |
$22,533 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 4.321 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES |
Savings: $28,850 Cost: $400 |
- | - | $28,850 | - | - | - | - | - |
- - kWh |
$28,850 - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 4.122 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS |
Savings: $78,789 Cost: $44,200 |
- | - | - | - | - | - | $78,789 | - |
- - kWh |
- - $ |
- - $ |
$78,789 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 4.323 OPTIMIZE LOT SIZES TO REDUCE INVENTORY CARRYING COSTS |
Savings: $105,300 Cost: $1,212 |
- | - | - | - | $105,300 | - | - | - |
- - kWh |
- - $ |
$105,300 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $253,518 Cost: $46,069 |
$18,046 | 225,567 | $28,850 | - | $127,833 | - | $78,789 | - | $18,046 225,567 kWh |
$28,850 - $ |
$127,833 - $ |
$78,789 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - - kWh |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | $ | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Administrative Changes | Primary Raw Material | Primary Product | Electricity Usage | Administrative Changes | Primary Raw Material | Primary Product |