IAC logo
IAC Assessment: MI0017
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MI0017
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Miami
Assessment Year 2001
Principal Product Aircraft and Airport Lighting Systems
NAICS n/a
SIC 3359 -
Sales $10,000,000-$50,000,000
# of Employees 208
Plant Area (Sq.Ft.) 74,880
Annual Production 0 Units
Production Hrs. Annual 4,680
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $101,613 1,783,260 kWh $0.06
Electricity Demand $51,351 6,324 kW-months/year $8.12
TOTAL ENERGY COSTS $178,339
RECOMMENDED SAVINGS* $272,529 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $129,955
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Primary Product Electricity Usage Electricity Demand Water Disposal Primary Product
$ kWh $ kW-months/year $ Tgal $ $
01: 4.432 CROSS-TRAIN PERSONNEL TO AVOID LOST TIME Savings:
$91,260
Cost:
$30
- - - - - - $91,260 - -
-
kWh
-
-
kW-months/year
-
-
Tgal
$91,260
-
$
02: 4.514 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS Savings:
$60,831
Cost:
$6,664
$11,057 193,986 - - - - $49,774 - $11,057
193,986
kWh
-
-
kW-months/year
-
-
Tgal
$49,774
-
$
03: 3.1161 ELIMINATE/REDUCE AN OPERATION Savings:
$6,170
Cost:
$120
- - - - $6,170 - - - -
-
kWh
-
-
kW-months/year
$6,170
-
Tgal
-
-
$
04: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$20,783
Cost:
$13
$13,006 228,181 $7,777 80 - - - - $13,006
228,181
kWh
$7,777
80
kW-months/year
-
-
Tgal
-
-
$
05: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$4,778
Cost:
$520
$3,500 61,402 $1,278 13 - - - - $3,500
61,402
kWh
$1,278
13
kW-months/year
-
-
Tgal
-
-
$
06: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$6,964
Cost:
$520
$5,101 89,482 $1,863 19 - - - - $5,101
89,482
kWh
$1,863
19
kW-months/year
-
-
Tgal
-
-
$
07: 4.511 EXPAND OPERATIONS INTO UNUSED SPACE Savings:
$81,743
Cost:
$42,000
$6,752 118,456 $5,223 54 - - $69,768 - $6,752
118,456
kWh
$5,223
54
kW-months/year
-
-
Tgal
$69,768
-
$
TOTAL RECOMMENDED Savings:
$272,529
Cost:
$49,867
$39,416 691,507 $16,141 166 $6,170 - $210,802 - $39,416
691,507
kWh
$16,141
166
kW-months/year
$6,170
-
Tgal
$210,802
-
$
TOTAL IMPLEMENTED Savings:
$129,955
Cost:
$1,203
$21,607 379,065 $10,918 112 $6,170 - $91,260 - $21,607
379,065
kWh
$10,918
112
kW-months/year
$6,170
-
Tgal
$91,260
-
$
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ $
Electricity Usage Electricity Demand Water Disposal Primary Product Electricity Usage Electricity Demand Water Disposal Primary Product