Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Miami
Assessment Year 2001
Principal Product Ambulances and Light rescue trucks
NAICS n/a
SIC 3711 - Motor Vehicles And Car Bodies
Sales $1,000,000-$5,000,000
# of Employees 325
Plant Area (Sq.Ft.) 223,925
Annual Production 2,520 Pieces
Production Hrs. Annual 2,168
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $163,636 2,773,494 kWh $0.06
Electricity Demand $41,510 9,875 kW-months/year $4.20
TOTAL ENERGY COSTS $205,146
RECOMMENDED SAVINGS* $53,013 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Primary Product Electricity Usage Primary Product
$ kWh $ $
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$20,022
Cost:
$10,000
$20,022 138,709 - - $20,022
138,709
kWh
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,044
Cost:
$312
$4,044 68,544 - - $4,044
68,544
kWh
-
-
$
03: 3.2123 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS Savings:
$8,400
Cost:
$2,000
- - $8,400 - -
-
kWh
$8,400
-
$
04: 2.7233 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT Savings:
$2,290
Cost:
$2,530
$2,290 38,814 - - $2,290
38,814
kWh
-
-
$
05: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$8,266
Cost:
$14,000
$8,266 140,102 - - $8,266
140,102
kWh
-
-
$
06: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$9,991
Cost:
$288
$9,991 169,340 - - $9,991
169,340
kWh
-
-
$
TOTAL RECOMMENDED Savings:
$53,013
Cost:
$29,130
$44,613 555,509 $8,400 - $44,613
555,509
kWh
$8,400
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
$
Savings
Cost
$ kWh $ $
Electricity Usage Primary Product Electricity Usage Primary Product