IAC logo
IAC Assessment: MI0028
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MI0028
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Miami
Assessment Year 2002
Principal Product Steel shelving
NAICS n/a
SIC 3443 - Fabricated Plate Work (boiler Shops)
Sales $10,000,000-$50,000,000
# of Employees 62
Plant Area (Sq.Ft.) 110,000
Annual Production 0 Units
Production Hrs. Annual 4,160
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $67,485 985,440 kWh $0.07
Electricity Demand $30,216 3,725 kW-months/year $8.11
Natural Gas $76,523 73,312 MMBtu $1.04
TOTAL ENERGY COSTS $174,224
RECOMMENDED SAVINGS* $97,675 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Water Disposal Primary Raw Material Electricity Usage Water Disposal Primary Raw Material
$ kWh $ Tgal $ $
01: 3.2123 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS Savings:
$61,673
Cost:
$3,000
- - - - $61,673 - -
-
kWh
-
-
Tgal
$61,673
-
$
02: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$15,305
Cost:
$930
$15,305 429,608 - - - - $15,305
429,608
kWh
-
-
Tgal
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$8,032
Cost:
$255
$8,032 116,410 - - - - $8,032
116,410
kWh
-
-
Tgal
-
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$7,051
Cost:
$8
$7,051 102,189 - - - - $7,051
102,189
kWh
-
-
Tgal
-
-
$
05: 3.5131 RECYCLE WHITE WATER Savings:
$5,465
Cost:
$601
- - $5,465 - - - -
-
kWh
$5,465
-
Tgal
-
-
$
06: 2.2514 COVER OPEN TANKS Savings:
$149
Cost:
$48
$149 2,163 - - - - $149
2,163
kWh
-
-
Tgal
-
-
$
TOTAL RECOMMENDED Savings:
$97,675
Cost:
$4,842
$30,537 650,370 $5,465 - $61,673 - $30,537
650,370
kWh
$5,465
-
Tgal
$61,673
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
Tgal
-
-
$
Savings
Cost
$ kWh $ Tgal $ $