IAC logo
IAC Assessment: MI0035
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MI0035
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Miami
Assessment Year 2002
Principal Product Corrugated Boxes
NAICS n/a
SIC 2653 - Corrugated And Solid Fiber Boxes
Sales $10,000,000-$50,000,000
# of Employees 128
Plant Area (Sq.Ft.) 128,000
Annual Production 470,000 Thousand Feet
Production Hrs. Annual 6,240
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $208,854 3,463,980 kWh $0.06
Electricity Demand $78,473 9,666 kW-months/year $8.12
Natural Gas $40,304 5,994 MMBtu $6.72
LPG $38,912 30,883 MMBtu $1.26
TOTAL ENERGY COSTS $366,543
RECOMMENDED SAVINGS* $56,542 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $36,743
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes
$ kWh $ kW-months/year $ $
01: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$10,558
Cost:
$975
$10,558 159,964 - - - - $10,558
159,964
kWh
-
-
kW-months/year
-
-
$
02: 2.4112 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS Savings:
$29,975
Cost:
$12,885
- - $29,975 3,691 - - -
-
kWh
$29,975
3,691
kW-months/year
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$6,768
Cost:
$240
- - - - $6,768 - -
-
kWh
-
-
kW-months/year
$6,768
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$5,825
Cost:
$2,000
- - - - $5,825 - -
-
kWh
-
-
kW-months/year
$5,825
-
$
05: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$2,597
Cost:
$3,500
$2,101 31,824 $496 61 - - $2,101
31,824
kWh
$496
61
kW-months/year
-
-
$
06: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$819
Cost:
$240
- - - - $819 - -
-
kWh
-
-
kW-months/year
$819
-
$
TOTAL RECOMMENDED Savings:
$56,542
Cost:
$19,840
$12,659 191,788 $30,471 3,752 $13,412 - $12,659
191,788
kWh
$30,471
3,752
kW-months/year
$13,412
-
$
TOTAL IMPLEMENTED Savings:
$36,743
Cost:
$13,125
- - $29,975 3,691 $6,768 - -
-
kWh
$29,975
3,691
kW-months/year
$6,768
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes