IAC logo
IAC Assessment: MI0052
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MI0052
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Miami
Assessment Year 2003
Principal Product Furniture
NAICS 337124 - Metal Household Furniture Manufacturing
SIC 2521 - Wood Office Furniture
Sales $10,000,000-$50,000,000
# of Employees 122
Plant Area (Sq.Ft.) 173,000
Annual Production 75,000 Pieces
Production Hrs. Annual 2,470
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $124,744 1,712,713 kWh $0.07
Electricity Demand $28,557 7,169 kW-months/year $3.98
Natural Gas $84,420 13,919 MMBtu $6.07
TOTAL ENERGY COSTS $237,721
RECOMMENDED SAVINGS* $291,795 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $239,229
#|Description Savings
Cost
Status Electricity Usage Administrative Changes Primary Product Electricity Usage Administrative Changes Primary Product
$ kWh $ $ $ $
01: 2.1135 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY Savings:
$14,442
Cost:
$372
$14,442 722,039 - - - - $14,442
722,039
kWh
-
-
$
-
-
$
02: 2.1135 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY Savings:
$7,425
Cost:
$422
$7,425 371,374 - - - - $7,425
371,374
kWh
-
-
$
-
-
$
03: 3.2123 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS Savings:
$30,699
Cost:
$1,000
- - - - $30,699 - -
-
kWh
-
-
$
$30,699
-
$
04: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$6,165
Cost:
$3,837
$6,165 102,752 - - - - $6,165
102,752
kWh
-
-
$
-
-
$
05: 4.522 MODIFY STORAGE SPACE TO AVOID RENTAL OF A WAREHOUSE Savings:
$233,064
Cost:
$48,450
- - $233,064 - - - -
-
kWh
$233,064
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$291,795
Cost:
$54,081
$28,032 1,196,165 $233,064 - $30,699 - $28,032
1,196,165
kWh
$233,064
-
$
$30,699
-
$
TOTAL IMPLEMENTED Savings:
$239,229
Cost:
$52,287
$6,165 102,752 $233,064 - - - $6,165
102,752
kWh
$233,064
-
$
-
-
$
Savings
Cost
$ kWh $ $ $ $
Electricity Usage Administrative Changes Primary Product Electricity Usage Administrative Changes Primary Product