Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Miami |
---|---|
Assessment Year | 2003 |
Principal Product | Cardboard sheets |
NAICS | 322130 - Paperboard Mills |
SIC | 2631 - Paperboard Mills |
Sales | $10,000,000-$50,000,000 |
# of Employees | 25 |
Plant Area (Sq.Ft.) | 68,706 |
Annual Production | 500,000 Thousand Feet |
Production Hrs. Annual | 8,736 |
Location (State) | FL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $159,745 | 2,282,070 | kWh | $0.07 |
Natural Gas | $234,247 | 40,121 | MMBtu | $5.84 |
TOTAL ENERGY COSTS | $393,992 | |||
RECOMMENDED SAVINGS* | $98,008 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $40,605 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Water Disposal | Electricity Usage | Natural Gas | Water Disposal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $1,444 Cost: $513 |
- | - | $1,444 | 247 | - | - |
- - kWh |
$1,444 247 MMBtu |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2113 REPAIR OR REPLACE STEAM TRAPS |
Savings: $1,282 Cost: $57 |
- | - | $1,282 | 220 | - | - |
- - kWh |
$1,282 220 MMBtu |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $49,692 Cost: $22,500 |
- | - | $49,692 | 8,509 | - | - |
- - kWh |
$49,692 8,509 MMBtu |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.1241 REDUCE EXCESSIVE BOILER BLOWDOWN |
Savings: $6,768 Cost: $4,500 |
- | - | $6,768 | 939 | - | - |
- - kWh |
$6,768 939 MMBtu |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $943 Cost: $1,792 |
$943 | 13,471 | - | - | - | - |
$943 13,471 kWh |
- - MMBtu |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.4155 METER WASTE WATER |
Savings: $36,908 Cost: $1,950 |
- | - | - | - | $36,908 | - |
- - kWh |
- - MMBtu |
$36,908 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $971 Cost: $258 |
$971 | 13,864 | - | - | - | - |
$971 13,864 kWh |
- - MMBtu |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $98,008 Cost: $31,570 |
$1,914 | 27,335 | $59,186 | 9,915 | $36,908 | - | $1,914 27,335 kWh |
$59,186 9,915 MMBtu |
$36,908 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $40,605 Cost: $2,778 |
$971 | 13,864 | $2,726 | 467 | $36,908 | - | $971 13,864 kWh |
$2,726 467 MMBtu |
$36,908 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Water Disposal | Electricity Usage | Natural Gas | Water Disposal |