IAC Assessment: MI0060
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MI0060
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Miami
Assessment Year 2003
Principal Product Cardboard sheets
NAICS 322130 - Paperboard Mills
SIC 2631 - Paperboard Mills
Sales $10,000,000-$50,000,000
# of Employees 25
Plant Area (Sq.Ft.) 68,706
Annual Production 500,000 Thousand Feet
Production Hrs. Annual 8,736
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $159,745 2,282,070 kWh $0.07
Natural Gas $234,247 40,121 MMBtu $5.84
TOTAL ENERGY COSTS $393,992
RECOMMENDED SAVINGS* $98,008 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $40,605
#|Description Savings
Cost
Status Electricity Usage Natural Gas Water Disposal Electricity Usage Natural Gas Water Disposal
$ kWh $ MMBtu $ Tgal
01: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$1,444
Cost:
$513
- - $1,444 247 - - -
-
kWh
$1,444
247
MMBtu
-
-
Tgal
02: 2.2113 REPAIR OR REPLACE STEAM TRAPS Savings:
$1,282
Cost:
$57
- - $1,282 220 - - -
-
kWh
$1,282
220
MMBtu
-
-
Tgal
03: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$49,692
Cost:
$22,500
- - $49,692 8,509 - - -
-
kWh
$49,692
8,509
MMBtu
-
-
Tgal
04: 2.1241 REDUCE EXCESSIVE BOILER BLOWDOWN Savings:
$6,768
Cost:
$4,500
- - $6,768 939 - - -
-
kWh
$6,768
939
MMBtu
-
-
Tgal
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$943
Cost:
$1,792
$943 13,471 - - - - $943
13,471
kWh
-
-
MMBtu
-
-
Tgal
06: 3.4155 METER WASTE WATER Savings:
$36,908
Cost:
$1,950
- - - - $36,908 - -
-
kWh
-
-
MMBtu
$36,908
-
Tgal
07: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$971
Cost:
$258
$971 13,864 - - - - $971
13,864
kWh
-
-
MMBtu
-
-
Tgal
TOTAL RECOMMENDED Savings:
$98,008
Cost:
$31,570
$1,914 27,335 $59,186 9,915 $36,908 - $1,914
27,335
kWh
$59,186
9,915
MMBtu
$36,908
-
Tgal
TOTAL IMPLEMENTED Savings:
$40,605
Cost:
$2,778
$971 13,864 $2,726 467 $36,908 - $971
13,864
kWh
$2,726
467
MMBtu
$36,908
-
Tgal
Savings
Cost
$ kWh $ MMBtu $ Tgal
Electricity Usage Natural Gas Water Disposal Electricity Usage Natural Gas Water Disposal