Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Miami |
---|---|
Assessment Year | 2004 |
Principal Product | Asphalt Mix |
NAICS | 324121 - Asphalt Paving Mixture and Block Manufacturing |
SIC | 2951 - Asphalt Paving Mixtures And Blocks |
Sales | $10,000,000-$50,000,000 |
# of Employees | 80 |
Plant Area (Sq.Ft.) | 70,000 |
Annual Production | 273,000 Tons |
Production Hrs. Annual | 2,600 |
Location (State) | FL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $28,614 | 599,760 | kWh | $0.05 |
Electricity Demand | $32,220 | 4,069 | kW-months/year | $7.92 |
Electricity Fees | $8,110 | - | $ | - |
TOTAL ENERGY COSTS | $68,944 | |||
RECOMMENDED SAVINGS* | $172,353 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Other Gas | Other Liquid (non-haz) | Administrative Changes | Primary Product | Electricity Usage | Other Gas | Other Liquid (non-haz) | Administrative Changes | Primary Product | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | gal | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE |
Savings: $566 Cost: $600 |
- | - | - | - | - | - | $566 | - | - | - |
- - kWh |
- - MMBtu |
- - gal |
$566 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE |
Savings: $396 Cost: $175 |
$396 | 8,312 | - | - | - | - | - | - | - | - |
$396 8,312 kWh |
- - MMBtu |
- - gal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $5,493 Cost: $942 |
$5,493 | 91,478 | - | - | - | - | - | - | - | - |
$5,493 91,478 kWh |
- - MMBtu |
- - gal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4314 USE SYNTHETIC LUBRICANT |
Savings: $5,140 Cost: $13,056 |
$1,612 | 29,988 | - | - | $408 | 408 | - | - | $3,120 | - |
$1,612 29,988 kWh |
- - MMBtu |
$408 408 gal |
- - $ |
$3,120 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $847 Cost: $420 |
$847 | 18,745 | - | - | - | - | - | - | - | - |
$847 18,745 kWh |
- - MMBtu |
- - gal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2424 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS |
Savings: $7,692 Cost: $795 |
- | - | $7,692 | 2,230 | - | - | - | - | - | - |
- - kWh |
$7,692 2,230 MMBtu |
- - gal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2514 COVER OPEN TANKS |
Savings: $152,219 Cost: $4,000 |
- | - | $218 | 436 | - | - | - | - | $152,001 | - |
- - kWh |
$218 436 MMBtu |
- - gal |
- - $ |
$152,001 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $172,353 Cost: $19,988 |
$8,348 | 148,523 | $7,910 | 2,666 | $408 | 408 | $566 | - | $155,121 | - | $8,348 148,523 kWh |
$7,910 2,666 MMBtu |
$408 408 gal |
$566 - $ |
$155,121 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - - kWh |
- - MMBtu |
- - gal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | gal | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Other Gas | Other Liquid (non-haz) | Administrative Changes | Primary Product | Electricity Usage | Other Gas | Other Liquid (non-haz) | Administrative Changes | Primary Product |