IAC Assessment: MI0079
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MI0079
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Miami
Assessment Year 2004
Principal Product Juice extraction, packaging and pellets
NAICS 311421 - Fruit and Vegetable Canning
SIC 2038 - Frozen Specialties, Nec
Sales $50,000,000-$100,000,000
# of Employees 135
Plant Area (Sq.Ft.) 254,800
Annual Production 214,986 Tons
Production Hrs. Annual 8,760
Location (State) Fl
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $634,626 13,584,648 kWh $0.05
Electricity Demand $238,810 29,746 kW-months/year $8.03
Electricity Fees $11,992 - $ -
Fuel Oil #6 $3,422,952 539,487 MMBtu $6.34
TOTAL ENERGY COSTS $4,308,380
RECOMMENDED SAVINGS* $370,405 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $138,625
#|Description Savings
Cost
Status Electricity Usage Fuel Oil #6 Administrative Changes Electricity Usage Fuel Oil #6 Administrative Changes
$ kWh $ MMBtu $ $
01: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$21,521
Cost:
$600
- - - - $21,521 - -
-
kWh
-
-
MMBtu
$21,521
-
$
02: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$7,957
Cost:
$1,649
- - $7,957 1,100 - - -
-
kWh
$7,957
1,100
MMBtu
-
-
$
03: 2.1221 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES Savings:
$108,501
Cost:
$33,050
- - $108,501 17,101 - - -
-
kWh
$108,501
17,101
MMBtu
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,693
Cost:
$250
$1,693 33,916 - - - - $1,693
33,916
kWh
-
-
MMBtu
-
-
$
05: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$138,625
Cost:
$68,380
- - $138,625 21,865 - - -
-
kWh
$138,625
21,865
MMBtu
-
-
$
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$19,937
Cost:
$61,795
$19,937 399,483 - - - - $19,937
399,483
kWh
-
-
MMBtu
-
-
$
07: 2.2511 INSULATE BARE EQUIPMENT Savings:
$778
Cost:
$178
$778 15,594 - - - - $778
15,594
kWh
-
-
MMBtu
-
-
$
08: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$3,053
Cost:
$450
- - $3,053 433 - - -
-
kWh
$3,053
433
MMBtu
-
-
$
09: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$60,234
Cost:
$5,408
- - $60,234 9,501 - - -
-
kWh
$60,234
9,501
MMBtu
-
-
$
10: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,416
Cost:
$2,670
$4,416 88,483 - - - - $4,416
88,483
kWh
-
-
MMBtu
-
-
$
11: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$3,690
Cost:
-
$3,690 73,790 - - - - $3,690
73,790
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$370,405
Cost:
$174,430
$30,514 611,266 $318,370 50,000 $21,521 - $30,514
611,266
kWh
$318,370
50,000
MMBtu
$21,521
-
$
TOTAL IMPLEMENTED Savings:
$138,625
Cost:
$68,380
- - $138,625 21,865 - - -
-
kWh
$138,625
21,865
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Fuel Oil #6 Administrative Changes Electricity Usage Fuel Oil #6 Administrative Changes