IAC logo
IAC Assessment: MI0084
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MI0084
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Miami
Assessment Year 2004
Principal Product Metal frame windows
NAICS 332321 - Metal Window and Door Manufacturing
SIC 3442 - Metal Doors, Sash, And Trim
Sales $10,000,000-$50,000,000
# of Employees 120
Plant Area (Sq.Ft.) 100,000
Annual Production 30,000 Pieces
Production Hrs. Annual 2,250
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $35,230 691,342 kWh $0.05
Electricity Demand $21,648 2,773 kW-months/year $7.81
Electricity Fees $7,920 - $ -
TOTAL ENERGY COSTS $64,798
RECOMMENDED SAVINGS* $631,916 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Personnel Changes Administrative Changes Primary Product Electricity Usage Personnel Changes Administrative Changes Primary Product
$ kWh $ $ $ $ $ $
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$2,732
Cost:
$1,000
$4,032 67,916 $(-1,300) - - - - - $4,032
67,916
kWh
$(-1,300)
-
$
-
-
$
-
-
$
02: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$600,000
Cost:
$183,400
- - - - - - $600,000 - -
-
kWh
-
-
$
-
-
$
$600,000
-
$
03: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$28,289
Cost:
$17,650
- - - - $28,289 - - - -
-
kWh
-
-
$
$28,289
-
$
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$697
Cost:
$590
$2,777 52,609 $(-2,080) - - - - - $2,777
52,609
kWh
$(-2,080)
-
$
-
-
$
-
-
$
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$198
Cost:
-
$198 3,777 - - - - - - $198
3,777
kWh
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$631,916
Cost:
$202,640
$7,007 124,302 $(-3,380) - $28,289 - $600,000 - $7,007
124,302
kWh
$(-3,380)
-
$
$28,289
-
$
$600,000
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ $ $ $ $ $
Electricity Usage Personnel Changes Administrative Changes Primary Product Electricity Usage Personnel Changes Administrative Changes Primary Product