IAC logo
IAC Assessment: MI0085
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MI0085
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Miami
Assessment Year 2004
Principal Product Automotive wiper blades
NAICS 336390 - Other Motor Vehicle Parts Manufacturing
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $10,000,000-$50,000,000
# of Employees 250
Plant Area (Sq.Ft.) 85,000
Annual Production 3,750,000 Pieces
Production Hrs. Annual 4,250
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $99,953 1,964,160 kWh $0.05
Electricity Demand $39,707 4,986 kW-months/year $7.96
Electricity Fees $15,201 - $ -
Natural Gas $70,282 7,474 MMBtu $9.40
TOTAL ENERGY COSTS $225,143
RECOMMENDED SAVINGS* $53,159 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $32,291
#|Description Savings
Cost
Status Electricity Usage Natural Gas Personnel Changes Administrative Changes Primary Product Electricity Usage Natural Gas Personnel Changes Administrative Changes Primary Product
$ kWh $ MMBtu $ $ $ $ $ $
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$8,514
Cost:
$2,300
$8,514 143,403 - - - - - - - - $8,514
143,403
kWh
-
-
MMBtu
-
-
$
-
-
$
-
-
$
02: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$21,699
Cost:
$1,200
- - - - - - $21,699 - - - -
-
kWh
-
-
MMBtu
-
-
$
$21,699
-
$
-
-
$
03: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$868
Cost:
-
- - $868 92 - - - - - - -
-
kWh
$868
92
MMBtu
-
-
$
-
-
$
-
-
$
04: 2.1135 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY Savings:
$1,834
Cost:
$130
$131 2,495 $1,703 181 - - - - - - $131
2,495
kWh
$1,703
181
MMBtu
-
-
$
-
-
$
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$(-19)
Cost:
$2,670
$2,061 39,169 - - $(-2,080) - - - - - $2,061
39,169
kWh
-
-
MMBtu
$(-2,080)
-
$
-
-
$
-
-
$
06: 4.4320 CROSS-TRAIN PERSONNEL TO AVOID LOST TIME Savings:
$20,000
Cost:
-
- - - - - - - - $20,000 - -
-
kWh
-
-
MMBtu
-
-
$
-
-
$
$20,000
-
$
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$263
Cost:
$102
$263 5,005 - - - - - - - - $263
5,005
kWh
-
-
MMBtu
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$53,159
Cost:
$6,402
$10,969 190,072 $2,571 273 $(-2,080) - $21,699 - $20,000 - $10,969
190,072
kWh
$2,571
273
MMBtu
$(-2,080)
-
$
$21,699
-
$
$20,000
-
$
TOTAL IMPLEMENTED Savings:
$32,291
Cost:
$6,402
$10,969 190,072 $1,703 181 $(-2,080) - $21,699 - - - $10,969
190,072
kWh
$1,703
181
MMBtu
$(-2,080)
-
$
$21,699
-
$
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $ $ $ $ $
Electricity Usage Natural Gas Personnel Changes Administrative Changes Primary Product Electricity Usage Natural Gas Personnel Changes Administrative Changes Primary Product