IAC logo
IAC Assessment: MI0087
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MI0087
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Miami
Assessment Year 2004
Principal Product Textile finishing
NAICS 313310 - Textile and Fabric Finishing Mills
SIC 2269 - Finishing Plants, Nec
Sales $5,000,000-$10,000,000
# of Employees 70
Plant Area (Sq.Ft.) 100,000
Annual Production 1,800 Pieces
Production Hrs. Annual 7,200
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $143,761 3,312,852 kWh $0.04
Electricity Demand $51,892 6,744 kW-months/year $7.69
Electricity Fees $27,051 - $ -
Natural Gas $474,068 73,414 MMBtu $6.46
TOTAL ENERGY COSTS $696,772
RECOMMENDED SAVINGS* $25,293 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Personnel Changes Administrative Changes Electricity Usage Natural Gas Personnel Changes Administrative Changes
$ kWh $ MMBtu $ $ $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,721
Cost:
$590
$4,801 54,657 - - $(-2,080) - - - $4,801
54,657
kWh
-
-
MMBtu
$(-2,080)
-
$
-
-
$
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,417
Cost:
$223
$1,417 28,517 - - - - - - $1,417
28,517
kWh
-
-
MMBtu
-
-
$
-
-
$
03: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$1,760
Cost:
$300
- - $1,760 273 - - - - -
-
kWh
$1,760
273
MMBtu
-
-
$
-
-
$
04: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$18,320
Cost:
$14,068
- - $18,320 2,836 - - - - -
-
kWh
$18,320
2,836
MMBtu
-
-
$
-
-
$
05: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$1,075
Cost:
$40
- - - - - - $1,075 - -
-
kWh
-
-
MMBtu
-
-
$
$1,075
-
$
TOTAL RECOMMENDED Savings:
$25,293
Cost:
$15,221
$6,218 83,174 $20,080 3,109 $(-2,080) - $1,075 - $6,218
83,174
kWh
$20,080
3,109
MMBtu
$(-2,080)
-
$
$1,075
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $ $ $
Electricity Usage Natural Gas Personnel Changes Administrative Changes Electricity Usage Natural Gas Personnel Changes Administrative Changes