IAC Assessment: MI0090
Sponsored by:
EERE AMO
IAC logo
IAC Assessment: MI0090
IAC Center University of Miami
Assessment Year 2004
Principal Product Newspaper pre-print production, Apparel manufacture
NAICS 315210 - Cut and Sew Apparel Contractors
SIC 2711 - Newspapers
Sales $10,000,000-$50,000,000
# of Employees 450
Plant Area (Sq.Ft.) 166,000
Annual Production 71,240,000 Pieces
Production Hrs. Annual 4,368
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $194,068 4,019,171 kWh $0.05
Electricity Demand $76,068 9,316 kW-months/year $8.17
Electricity Fees $34,463 - $ -
TOTAL ENERGY COSTS $304,599
RECOMMENDED SAVINGS* $97,069 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Administrative Changes Electricity Usage Administrative Changes
$ kWh $ $
01: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$4,659
Cost:
$600
- - $4,659 - -
-
kWh
$4,659
-
$
02: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$53,281
Cost:
$47,250
$53,281 1,072,934 - - $53,281
1,072,934
kWh
-
-
$
03: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$1,440
Cost:
$610
$1,440 28,805 - - $1,440
28,805
kWh
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$7,398
Cost:
$590
$7,398 148,938 - - $7,398
148,938
kWh
-
-
$
05: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT Savings:
$1,667
Cost:
$5,660
$1,667 33,555 - - $1,667
33,555
kWh
-
-
$
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$3,333
Cost:
$112
$3,333 67,110 - - $3,333
67,110
kWh
-
-
$
07: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$25,291
Cost:
$6,163
$25,291 509,400 - - $25,291
509,400
kWh
-
-
$
TOTAL RECOMMENDED Savings:
$97,069
Cost:
$60,985
$92,410 1,860,742 $4,659 - $92,410
1,860,742
kWh
$4,659
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
$
Savings
Cost
$ kWh $ $
Electricity Usage Administrative Changes Electricity Usage Administrative Changes