IAC logo
IAC Assessment: MI0093
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MI0093
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Miami
Assessment Year 2004
Principal Product Electrical Cables
NAICS 335931 - Current-Carrying Wiring Device Manufacturing
SIC 3643 - Current-carrying Wiring Devices
Sales $10,000,000-$50,000,000
# of Employees 69
Plant Area (Sq.Ft.) 67,000
Annual Production 200,000 Pieces
Production Hrs. Annual 4,000
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $90,563 1,801,440 kWh $0.05
Electricity Demand $42,914 5,332 kW-months/year $8.05
Electricity Fees $11,260 - $ -
LPG $4,920 284 MMBtu $17.32
TOTAL ENERGY COSTS $149,657
RECOMMENDED SAVINGS* $125,336 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $32,088
#|Description Savings
Cost
Status Electricity Usage Personnel Changes Administrative Changes Primary Product Electricity Usage Personnel Changes Administrative Changes Primary Product
$ kWh $ $ $ $ $ $
01: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$2,620
Cost:
-
- - - - $2,620 - - - -
-
kWh
-
-
$
$2,620
-
$
-
-
$
02: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$44,199
Cost:
-
$44,199 744,500 - - - - - - $44,199
744,500
kWh
-
-
$
-
-
$
-
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$553
Cost:
-
$553 10,479 - - - - - - $553
10,479
kWh
-
-
$
-
-
$
-
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,800
Cost:
-
$1,800 34,133 - - - - - - $1,800
34,133
kWh
-
-
$
-
-
$
-
-
$
05: 3.2176 INCREASE USE OF AUTOMATION Savings:
$28,521
Cost:
-
- - - - - - $28,521 - -
-
kWh
-
-
$
-
-
$
$28,521
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,994
Cost:
-
$3,474 65,887 $(-480) - - - - - $3,474
65,887
kWh
$(-480)
-
$
-
-
$
-
-
$
07: 2.7228 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM Savings:
$8,755
Cost:
$510
$8,755 83,211 - - - - - - $8,755
83,211
kWh
-
-
$
-
-
$
-
-
$
08: 4.622 INSTALL ROTATING CAROUSELS TO REDUCE SET-UP TIMES Savings:
$23,333
Cost:
$21,000
- - - - - - $23,333 - -
-
kWh
-
-
$
-
-
$
$23,333
-
$
09: 2.7444 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS Savings:
$12,561
Cost:
-
$12,561 238,764 - - - - - - $12,561
238,764
kWh
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$125,336
Cost:
$21,510
$71,342 1,176,974 $(-480) - $2,620 - $51,854 - $71,342
1,176,974
kWh
$(-480)
-
$
$2,620
-
$
$51,854
-
$
TOTAL IMPLEMENTED Savings:
$32,088
Cost:
$21,510
$8,755 83,211 - - - - $23,333 - $8,755
83,211
kWh
-
-
$
-
-
$
$23,333
-
$
Savings
Cost
$ kWh $ $ $ $ $ $
Electricity Usage Personnel Changes Administrative Changes Primary Product Electricity Usage Personnel Changes Administrative Changes Primary Product