IAC Assessment: MI0095
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MI0095
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Miami
Assessment Year 2004
Principal Product Aircraft engine and engine parts manufacture
NAICS 336412 - Aircraft Engine and Engine Parts Manufacturing
SIC 3724 - Aircraft Engines And Engine Parts
Sales $1,000,000-$5,000,000
# of Employees 45
Plant Area (Sq.Ft.) 100,000
Annual Production 19,200 Pieces
Production Hrs. Annual 2,125
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $162,958 3,342,800 kWh $0.05
Electricity Demand $78,258 9,578 kW-months/year $8.17
Electricity Fees $27,718 - $ -
Natural Gas $149,521 21,286 MMBtu $7.02
TOTAL ENERGY COSTS $418,455
RECOMMENDED SAVINGS* $206,468 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,558
#|Description Savings
Cost
Status Electricity Usage Natural Gas Personnel Changes Administrative Changes Primary Product Electricity Usage Natural Gas Personnel Changes Administrative Changes Primary Product
$ kWh $ MMBtu $ $ $ $ $ $
01: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$3,778
Cost:
$600
- - - - - - $3,778 - - - -
-
kWh
-
-
MMBtu
-
-
$
$3,778
-
$
-
-
$
02: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$70,081
Cost:
$2,300
$70,081 1,250,823 - - - - - - - - $70,081
1,250,823
kWh
-
-
MMBtu
-
-
$
-
-
$
-
-
$
03: 4.1110 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$120,575
Cost:
-
$18,825 233,996 $10,460 1,490 $(-75,000) - - - $166,290 - $18,825
233,996
kWh
$10,460
1,490
MMBtu
$(-75,000)
-
$
-
-
$
$166,290
-
$
04: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT Savings:
$2,100
Cost:
$5,660
$2,100 42,321 - - - - - - - - $2,100
42,321
kWh
-
-
MMBtu
-
-
$
-
-
$
-
-
$
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$862
Cost:
$543
- - $862 153 - - - - - - -
-
kWh
$862
153
MMBtu
-
-
$
-
-
$
-
-
$
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,100
Cost:
$144
$2,100 42,320 - - - - - - - - $2,100
42,320
kWh
-
-
MMBtu
-
-
$
-
-
$
-
-
$
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$6,514
Cost:
$894
$7,090 142,874 - - $(-576) - - - - - $7,090
142,874
kWh
-
-
MMBtu
$(-576)
-
$
-
-
$
-
-
$
08: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$458
Cost:
$186
$458 15,733 - - - - - - - - $458
15,733
kWh
-
-
MMBtu
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$206,468
Cost:
$10,327
$100,654 1,728,067 $11,322 1,643 $(-75,576) - $3,778 - $166,290 - $100,654
1,728,067
kWh
$11,322
1,643
MMBtu
$(-75,576)
-
$
$3,778
-
$
$166,290
-
$
TOTAL IMPLEMENTED Savings:
$2,558
Cost:
$330
$2,558 58,053 - - - - - - - - $2,558
58,053
kWh
-
-
MMBtu
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $ $ $ $ $
Electricity Usage Natural Gas Personnel Changes Administrative Changes Primary Product Electricity Usage Natural Gas Personnel Changes Administrative Changes Primary Product