IAC logo
IAC Assessment: MI0096
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MI0096
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Miami
Assessment Year 2004
Principal Product Printing Machine Manufacture
NAICS 333244 - Printing Machinery and Equipment Manufacturing
SIC 3555 - Printing Trades Machinery
Sales $10,000,000-$50,000,000
# of Employees 98
Plant Area (Sq.Ft.) 40,000
Annual Production 15 Pieces
Production Hrs. Annual 2,125
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $34,146 631,008 kWh $0.05
Electricity Demand $18,719 2,774 kW-months/year $6.75
Electricity Fees $10,886 - $ -
TOTAL ENERGY COSTS $63,751
RECOMMENDED SAVINGS* $16,638 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,976
#|Description Savings
Cost
Status Electricity Usage Personnel Changes Primary Product Electricity Usage Personnel Changes Primary Product
$ kWh $ $ $ $
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$6,113
Cost:
$800
$7,613 128,241 $(-1,500) - - - $7,613
128,241
kWh
$(-1,500)
-
$
-
-
$
02: 2.4156 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM Savings:
$3,213
Cost:
$1,250
$213 4,072 $(-7,000) - $10,000 - $213
4,072
kWh
$(-7,000)
-
$
$10,000
-
$
03: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$6,619
Cost:
$150
$6,619 125,893 - - - - $6,619
125,893
kWh
-
-
$
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$(-147)
Cost:
$1,015
$1,053 19,812 $(-1,200) - - - $1,053
19,812
kWh
$(-1,200)
-
$
-
-
$
05: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$696
Cost:
$189
$313 5,945 - - $383 - $313
5,945
kWh
-
-
$
$383
-
$
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$110
Cost:
$56
$110 2,034 - - - - $110
2,034
kWh
-
-
$
-
-
$
07: 2.2514 COVER OPEN TANKS Savings:
$34
Cost:
$25
$34 654 - - - - $34
654
kWh
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$16,638
Cost:
$3,485
$15,955 286,651 $(-9,700) - $10,383 - $15,955
286,651
kWh
$(-9,700)
-
$
$10,383
-
$
TOTAL IMPLEMENTED Savings:
$9,976
Cost:
$1,481
$6,976 132,653 $(-7,000) - $10,000 - $6,976
132,653
kWh
$(-7,000)
-
$
$10,000
-
$
Savings
Cost
$ kWh $ $ $ $
Electricity Usage Personnel Changes Primary Product Electricity Usage Personnel Changes Primary Product