IAC logo
IAC Assessment: MI0097
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MI0097
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Miami
Assessment Year 2005
Principal Product Pharmaceutical preparation
NAICS 325412 - Pharmaceutical Preparation Manufacturing
SIC 2834 - Pharmaceutical Preparations
Sales $50,000,000-$100,000,000
# of Employees 300
Plant Area (Sq.Ft.) 134,047
Annual Production 363,000,000 Pieces
Production Hrs. Annual 8,400
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $361,529 10,245,600 kWh $0.04
Electricity Demand $107,843 17,883 kW-months/year $6.03
Electricity Fees $94,796 - $ -
Natural Gas $240,280 298,797 MMBtu $0.80
TOTAL ENERGY COSTS $804,448
RECOMMENDED SAVINGS* $124,394 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Personnel Changes Electricity Usage Natural Gas Personnel Changes
$ kWh $ MMBtu $ $
01: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$3,490
Cost:
$2,100
- - - - $3,490 - -
-
kWh
-
-
MMBtu
$3,490
-
$
02: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$59,412
Cost:
$800
$59,412 1,000,740 - - - - $59,412
1,000,740
kWh
-
-
MMBtu
-
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$24,212
Cost:
$52,535
$24,212 508,123 - - - - $24,212
508,123
kWh
-
-
MMBtu
-
-
$
04: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$5,883
Cost:
$30
- - $5,883 732 - - -
-
kWh
$5,883
732
MMBtu
-
-
$
05: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$3,188
Cost:
$7,077
$3,188 57,955 - - - - $3,188
57,955
kWh
-
-
MMBtu
-
-
$
06: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$28,209
Cost:
$71,500
$28,209 666,701 - - - - $28,209
666,701
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$124,394
Cost:
$134,042
$115,021 2,233,519 $5,883 732 $3,490 - $115,021
2,233,519
kWh
$5,883
732
MMBtu
$3,490
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Personnel Changes Electricity Usage Natural Gas Personnel Changes