Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Miami |
---|---|
Assessment Year | 2005 |
Principal Product | EPS foam product, Polyisocyanurate (ISO) rigid foam |
NAICS | 326140 - Polystyrene Foam Product Manufacturing |
SIC | 3086 - Plastics Foam Products |
Sales | $10,000,000-$50,000,000 |
# of Employees | 55 |
Plant Area (Sq.Ft.) | 60,000 |
Annual Production | 62,000 Thousand Feet |
Production Hrs. Annual | 4,250 |
Location (State) | FL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $78,659 | 1,495,200 | kWh | $0.05 |
Electricity Demand | $41,094 | 5,156 | kW-months/year | $7.97 |
Electricity Fees | $14,635 | - | $ | - |
Natural Gas | $49,329 | 4,899 | MMBtu | $10.07 |
TOTAL ENERGY COSTS | $192,896 | |||
RECOMMENDED SAVINGS* | $41,100 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $38,346 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Water Disposal | Ancillary Material Cost | Primary Product | Increase in Production | Electricity Usage | Natural Gas | Water Disposal | Ancillary Material Cost | Primary Product | Increase in Production | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | Tgal | $ | $ | $ | $ | $ | % | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE |
Savings: $24,731 Cost: $1,000 |
$24,731 | 416,577 | - | - | - | - | - | - | - | - | - | - |
$24,731 416,577 kWh |
- - MMBtu |
- - Tgal |
- - $ |
- - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 4.131 MODIFY PROCESS TO REDUCE MATERIAL USE/COST |
Savings: $7,463 Cost: $111 |
- | - | - | - | - | - | - | - | $7,462 | - | $1 | - |
- - kWh |
- - MMBtu |
- - Tgal |
- - $ |
$7,462 - $ |
$1 - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE |
Savings: $4,950 Cost: $1,910 |
- | - | - | - | - | - | $4,950 | - | - | - | - | - |
- - kWh |
- - MMBtu |
- - Tgal |
$4,950 - $ |
- - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) |
Savings: $2,754 Cost: $4,360 |
- | - | - | - | $2,754 | - | - | - | - | - | - | - |
- - kWh |
- - MMBtu |
$2,754 - Tgal |
- - $ |
- - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS |
Savings: $901 Cost: $380 |
- | - | $901 | 89 | - | - | - | - | - | - | - | - |
- - kWh |
$901 89 MMBtu |
- - Tgal |
- - $ |
- - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $301 Cost: $400 |
$301 | 5,705 | - | - | - | - | - | - | - | - | - | - |
$301 5,705 kWh |
- - MMBtu |
- - Tgal |
- - $ |
- - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $41,100 Cost: $8,161 |
$25,032 | 422,282 | $901 | 89 | $2,754 | - | $4,950 | - | $7,462 | - | $1 | - | $25,032 422,282 kWh |
$901 89 MMBtu |
$2,754 - Tgal |
$4,950 - $ |
$7,462 - $ |
$1 - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $38,346 Cost: $3,801 |
$25,032 | 422,282 | $901 | 89 | - | - | $4,950 | - | $7,462 | - | $1 | - | $25,032 422,282 kWh |
$901 89 MMBtu |
- - Tgal |
$4,950 - $ |
$7,462 - $ |
$1 - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | Tgal | $ | $ | $ | $ | $ | % | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Water Disposal | Ancillary Material Cost | Primary Product | Increase in Production | Electricity Usage | Natural Gas | Water Disposal | Ancillary Material Cost | Primary Product | Increase in Production |