IAC Assessment: MI0102
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MI0102
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Miami
Assessment Year 2005
Principal Product Glass windows manufactured from purchased glass
NAICS 327215 - Glass Product Manufacturing Made of Purchased Glass
SIC 3231 - Products Of Purchased Glass
Sales $10,000,000-$50,000,000
# of Employees 99
Plant Area (Sq.Ft.) 60,000
Annual Production 17,030,000 Thousand Feet
Production Hrs. Annual 6,000
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $359,540 6,081,998 kWh $0.06
Electricity Demand $109,909 15,160 kW-months/year $7.25
Electricity Fees $82,761 - $ -
TOTAL ENERGY COSTS $552,210
RECOMMENDED SAVINGS* $201,789 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Personnel Changes Administrative Changes Increase in Production Electricity Usage Personnel Changes Administrative Changes Increase in Production
$ kWh $ $ $ $ $ %
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$100,313
Cost:
$40,224
$100,313 3,165,581 - - - - - - $100,313
3,165,581
kWh
-
-
$
-
-
$
-
-
%
02: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$66,212
Cost:
$29,320
$2,512 36,917 - - $63,700 - - - $2,512
36,917
kWh
-
-
$
$63,700
-
$
-
-
%
03: 4.123 REDUCE DEFECTS BY REDUCING PRODUCT TIPPING Savings:
$23,325
Cost:
$1,104
$325 4,464 - - - - $23,000 - $325
4,464
kWh
-
-
$
-
-
$
$23,000
-
%
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$7,890
Cost:
$162
$7,890 116,413 - - - - - - $7,890
116,413
kWh
-
-
$
-
-
$
-
-
%
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,049
Cost:
$870
$4,529 68,768 $(-480) - - - - - $4,529
68,768
kWh
$(-480)
-
$
-
-
$
-
-
%
TOTAL RECOMMENDED Savings:
$201,789
Cost:
$71,680
$115,569 3,392,143 $(-480) - $63,700 - $23,000 - $115,569
3,392,143
kWh
$(-480)
-
$
$63,700
-
$
$23,000
-
%
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
$
-
-
$
-
-
%
Savings
Cost
$ kWh $ $ $ $ $ %
Electricity Usage Personnel Changes Administrative Changes Increase in Production Electricity Usage Personnel Changes Administrative Changes Increase in Production