Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Miami |
---|---|
Assessment Year | 2005 |
Principal Product | Glass windows manufactured from purchased glass |
NAICS | 327215 - Glass Product Manufacturing Made of Purchased Glass |
SIC | 3231 - Products Of Purchased Glass |
Sales | $10,000,000-$50,000,000 |
# of Employees | 99 |
Plant Area (Sq.Ft.) | 60,000 |
Annual Production | 17,030,000 Thousand Feet |
Production Hrs. Annual | 6,000 |
Location (State) | FL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $359,540 | 6,081,998 | kWh | $0.06 |
Electricity Demand | $109,909 | 15,160 | kW-months/year | $7.25 |
Electricity Fees | $82,761 | - | $ | - |
TOTAL ENERGY COSTS | $552,210 | |||
RECOMMENDED SAVINGS* | $201,789 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Personnel Changes | Administrative Changes | Increase in Production | Electricity Usage | Personnel Changes | Administrative Changes | Increase in Production | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | $ | $ | $ | $ | % | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $100,313 Cost: $40,224 |
$100,313 | 3,165,581 | - | - | - | - | - | - |
$100,313 3,165,581 kWh |
- - $ |
- - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK |
Savings: $66,212 Cost: $29,320 |
$2,512 | 36,917 | - | - | $63,700 | - | - | - |
$2,512 36,917 kWh |
- - $ |
$63,700 - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 4.123 REDUCE DEFECTS BY REDUCING PRODUCT TIPPING |
Savings: $23,325 Cost: $1,104 |
$325 | 4,464 | - | - | - | - | $23,000 | - |
$325 4,464 kWh |
- - $ |
- - $ |
$23,000 - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $7,890 Cost: $162 |
$7,890 | 116,413 | - | - | - | - | - | - |
$7,890 116,413 kWh |
- - $ |
- - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $4,049 Cost: $870 |
$4,529 | 68,768 | $(-480) | - | - | - | - | - |
$4,529 68,768 kWh |
$(-480) - $ |
- - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $201,789 Cost: $71,680 |
$115,569 | 3,392,143 | $(-480) | - | $63,700 | - | $23,000 | - | $115,569 3,392,143 kWh |
$(-480) - $ |
$63,700 - $ |
$23,000 - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - - kWh |
- - $ |
- - $ |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | $ | $ | $ | $ | % | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Personnel Changes | Administrative Changes | Increase in Production | Electricity Usage | Personnel Changes | Administrative Changes | Increase in Production |