IAC logo
IAC Assessment: MI0103
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MI0103
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Miami
Assessment Year 2005
Principal Product Soft drink manufacturing
NAICS 312111 - Soft Drink Manufacturing
SIC 2086 - Bottled And Canned Soft Drinks
Sales $50,000,000-$100,000,000
# of Employees 130
Plant Area (Sq.Ft.) 180,000
Annual Production 16,000,000 Pieces
Production Hrs. Annual 6,000
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $311,704 6,278,031 kWh $0.05
Electricity Demand $134,464 16,398 kW-months/year $8.20
Electricity Fees $47,712 - $ -
Natural Gas $192,944 20,166 MMBtu $9.57
TOTAL ENERGY COSTS $686,824
RECOMMENDED SAVINGS* $73,730 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL Savings:
$61,700
Cost:
$195,000
$12,300 246,000 - - - - $40,000 - $9,400 - $12,300
246,000
kWh
-
-
kW-months/year
-
-
MMBtu
$40,000
-
$
$9,400
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$6,798
Cost:
$906
$5,912 119,071 $1,558 190 - - $(-672) - - - $5,912
119,071
kWh
$1,558
190
kW-months/year
-
-
MMBtu
$(-672)
-
$
-
-
$
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$2,613
Cost:
$6,960
- - - - $2,613 273 - - - - -
-
kWh
-
-
kW-months/year
$2,613
273
MMBtu
-
-
$
-
-
$
04: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT Savings:
$1,062
Cost:
$1,536
$825 16,618 $237 29 - - - - - - $825
16,618
kWh
$237
29
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,001
Cost:
$288
$1,001 20,163 - - - - - - - - $1,001
20,163
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
06: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$556
Cost:
$486
$556 11,190 - - - - - - - - $556
11,190
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$73,730
Cost:
$205,176
$20,594 413,042 $1,795 219 $2,613 273 $39,328 - $9,400 - $20,594
413,042
kWh
$1,795
219
kW-months/year
$2,613
273
MMBtu
$39,328
-
$
$9,400
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost