IAC logo
IAC Assessment: MI0105
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MI0105
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Miami
Assessment Year 2005
Principal Product Newspaper Printing
NAICS 511110 - Newspaper Publishers
SIC 2711 - Newspapers
Sales $50,000,000-$100,000,000
# of Employees 450
Plant Area (Sq.Ft.) 280,000
Annual Production 120,000,000 Pieces
Production Hrs. Annual 8,760
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,321,159 27,003,183 kWh $0.05
Electricity Demand $328,346 60,195 kW-months/year $5.45
Electricity Fees $279,515 - $ -
Natural Gas $36,904 4,896 MMBtu $7.54
TOTAL ENERGY COSTS $1,965,924
RECOMMENDED SAVINGS* $180,238 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$81,540
Cost:
$120,000
$81,540 1,430,800 - - - - $81,540
1,430,800
kWh
-
-
kW-months/year
-
-
MMBtu
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$44,261
Cost:
$320
$31,678 500,164 $12,583 1,960 - - $31,678
500,164
kWh
$12,583
1,960
kW-months/year
-
-
MMBtu
03: 2.1223 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) Savings:
$26,325
Cost:
$32,000
- - - - $26,325 2,440 -
-
kWh
-
-
kW-months/year
$26,325
2,440
MMBtu
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$16,112
Cost:
-
$13,618 283,617 $2,494 9,713 - - $13,618
283,617
kWh
$2,494
9,713
kW-months/year
-
-
MMBtu
05: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$7,381
Cost:
$14,100
$7,381 147,620 - - - - $7,381
147,620
kWh
-
-
kW-months/year
-
-
MMBtu
06: 2.7122 DISCONNECT BALLASTS Savings:
$4,619
Cost:
-
$4,619 39,648 - - - - $4,619
39,648
kWh
-
-
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$180,238
Cost:
$166,420
$138,836 2,401,849 $15,077 11,673 $26,325 2,440 $138,836
2,401,849
kWh
$15,077
11,673
kW-months/year
$26,325
2,440
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas