IAC logo
IAC Assessment: MI0106
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MI0106
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Miami
Assessment Year 2005
Principal Product Woodworking
NAICS 321918 - Other Millwork (including Flooring)
SIC 2431 - Millwork
Sales $10,000,000-$50,000,000
# of Employees 150
Plant Area (Sq.Ft.) 70,000
Annual Production 25,000 Thousand Feet
Production Hrs. Annual 2,250
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $50,624 962,257 kWh $0.05
Electricity Demand $31,854 4,725 kW-months/year $6.74
Electricity Fees $14,886 - $ -
TOTAL ENERGY COSTS $97,364
RECOMMENDED SAVINGS* $40,126 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $28,887
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Electricity Usage Electricity Demand Personnel Changes
$ kWh $ kW-months/year $ $
01: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$19,885
Cost:
$760
$760 5,052 - - $19,125 - $760
5,052
kWh
-
-
kW-months/year
$19,125
-
$
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$9,649
Cost:
$12,563
$7,143 135,762 $2,506 26 - - $7,143
135,762
kWh
$2,506
26
kW-months/year
-
-
$
03: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$6,418
Cost:
$225
$6,418 108,099 - - - - $6,418
108,099
kWh
-
-
kW-months/year
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,194
Cost:
$862
$1,866 24,937 - - $(-672) - $1,866
24,937
kWh
-
-
kW-months/year
$(-672)
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,390
Cost:
$56
$1,390 14,851 - - - - $1,390
14,851
kWh
-
-
kW-months/year
-
-
$
06: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$834
Cost:
$600
$834 - - - - - $834
-
kWh
-
-
kW-months/year
-
-
$
07: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT Savings:
$756
Cost:
$1,536
$756 8,531 - - - - $756
8,531
kWh
-
-
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$40,126
Cost:
$16,602
$19,167 297,232 $2,506 26 $18,453 - $19,167
297,232
kWh
$2,506
26
kW-months/year
$18,453
-
$
TOTAL IMPLEMENTED Savings:
$28,887
Cost:
$1,903
$10,434 152,939 - - $18,453 - $10,434
152,939
kWh
-
-
kW-months/year
$18,453
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Personnel Changes Electricity Usage Electricity Demand Personnel Changes