Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Miami |
---|---|
Assessment Year | 2005 |
Principal Product | OEM lighting devices |
NAICS | 335931 - Current-Carrying Wiring Device Manufacturing |
SIC | 3643 - Current-carrying Wiring Devices |
Sales | $50,000,000-$100,000,000 |
# of Employees | 250 |
Plant Area (Sq.Ft.) | 42,000 |
Annual Production | 20,000,000 Pieces |
Production Hrs. Annual | 6,000 |
Location (State) | FL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $98,735 | 1,781,443 | kWh | $0.06 |
Electricity Demand | $33,686 | 4,250 | kW-months/year | $7.93 |
Electricity Fees | $14,446 | - | $ | - |
TOTAL ENERGY COSTS | $146,867 | |||
RECOMMENDED SAVINGS* | $59,925 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $12,669 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Administrative Changes | Electricity Usage | Electricity Demand | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $1,754 Cost: $2,512 |
$1,379 | 24,239 | $375 | 45 | - | - |
$1,379 24,239 kWh |
$375 45 kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2523 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS |
Savings: $39,673 Cost: $4,275 |
$29,947 | 590,205 | $9,726 | 1,180 | - | - |
$29,947 590,205 kWh |
$9,726 1,180 kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $9,648 Cost: $1,074 |
$7,827 | 137,527 | $1,821 | 218 | - | - |
$7,827 137,527 kWh |
$1,821 218 kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $2,032 Cost: $56 |
$1,460 | 25,642 | $572 | 68 | - | - |
$1,460 25,642 kWh |
$572 68 kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $3,307 Cost: $47 |
$2,564 | 44,640 | $743 | 89 | - | - |
$2,564 44,640 kWh |
$743 89 kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS |
Savings: $2,244 Cost: $759 |
$1,740 | 30,300 | $504 | 61 | - | - |
$1,740 30,300 kWh |
$504 61 kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES |
Savings: $1,267 Cost: - |
- | - | - | - | $1,267 | - |
- - kWh |
- - kW-months/year |
$1,267 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $59,925 Cost: $8,723 |
$44,917 | 852,553 | $13,741 | 1,661 | $1,267 | - | $44,917 852,553 kWh |
$13,741 1,661 kW-months/year |
$1,267 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $12,669 Cost: $3,586 |
$9,206 | 161,766 | $2,196 | 263 | $1,267 | - | $9,206 161,766 kWh |
$2,196 263 kW-months/year |
$1,267 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Administrative Changes | Electricity Usage | Electricity Demand | Administrative Changes |