Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Miami |
---|---|
Assessment Year | 2005 |
Principal Product | industrial hydraulic valves |
NAICS | 332999 - All Other Miscellaneous Fabricated Metal Product Manufacturing |
SIC | 3499 - Fabricated Metal Products, Nec |
Sales | $50,000,000-$100,000,000 |
# of Employees | 380 |
Plant Area (Sq.Ft.) | 50,000 |
Annual Production | 650,000 Pieces |
Production Hrs. Annual | 5,250 |
Location (State) | FL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $306,863 | 6,006,400 | kWh | $0.05 |
Electricity Demand | $113,467 | 13,741 | kW-months/year | $8.26 |
Electricity Fees | $27,888 | - | $ | - |
TOTAL ENERGY COSTS | $448,218 | |||
RECOMMENDED SAVINGS* | $29,038 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $25,373 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Personnel Changes | Administrative Changes | Electricity Usage | Electricity Demand | Personnel Changes | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE |
Savings: $16,898 Cost: $1,350 |
$16,898 | 330,750 | - | - | - | - | - | - |
$16,898 330,750 kWh |
- - kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2523 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS |
Savings: $4,463 Cost: $11,400 |
$(-95) | (-1,865) | - | - | - | - | $4,558 | - |
$(-95) (-1,865) kWh |
- - kW-months/year |
- - $ |
$4,558 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $4,012 Cost: $906 |
$2,679 | 52,441 | $1,557 | 188 | $(-224) | - | - | - |
$2,679 52,441 kWh |
$1,557 188 kW-months/year |
$(-224) - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $2,621 Cost: $56 |
$1,968 | 38,518 | $653 | 79 | - | - | - | - |
$1,968 38,518 kWh |
$653 79 kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT |
Savings: $1,044 Cost: $5,024 |
$843 | 16,493 | $201 | 24 | - | - | - | - |
$843 16,493 kWh |
$201 24 kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $29,038 Cost: $18,736 |
$22,293 | 436,337 | $2,411 | 291 | $(-224) | - | $4,558 | - | $22,293 436,337 kWh |
$2,411 291 kW-months/year |
$(-224) - $ |
$4,558 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $25,373 Cost: $13,656 |
$19,482 | 381,326 | $1,557 | 188 | $(-224) | - | $4,558 | - | $19,482 381,326 kWh |
$1,557 188 kW-months/year |
$(-224) - $ |
$4,558 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||