Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Miami
Assessment Year 2005
Principal Product Metal Patio Furniture
NAICS 337124 - Metal Household Furniture Manufacturing
SIC 2514 - Metal Household Furniture
Sales $10,000,000-$50,000,000
# of Employees 275
Plant Area (Sq.Ft.) 80,000
Annual Production 230,000 Pieces
Production Hrs. Annual 2,250
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $95,718 1,886,880 kWh $0.05
Electricity Demand $66,793 8,103 kW-months/year $8.24
Electricity Fees $3,190 - $ -
Natural Gas $83,432 11,919 MMBtu $7.00
TOTAL ENERGY COSTS $249,133
RECOMMENDED SAVINGS* $39,643 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$14,993
Cost:
$9,230
$12,170 239,891 $2,823 343 - - - - - - $12,170
239,891
kWh
$2,823
343
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$8,966
Cost:
$4,628
- - - - $8,966 1,352 - - - - -
-
kWh
-
-
kW-months/year
$8,966
1,352
MMBtu
-
-
$
-
-
$
03: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$6,306
Cost:
$65
$4,483 88,351 $1,823 221 - - - - - - $4,483
88,351
kWh
$1,823
221
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,896
Cost:
$862
$3,641 71,777 $591 72 - - $(-336) - - - $3,641
71,777
kWh
$591
72
kW-months/year
-
-
MMBtu
$(-336)
-
$
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,613
Cost:
$56
$1,468 28,944 $1,145 139 - - - - - - $1,468
28,944
kWh
$1,145
139
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
06: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$1,808
Cost:
$84
$1,808 35,701 - - - - - - - - $1,808
35,701
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
07: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$1,061
Cost:
-
- - - - - - - - $1,061 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$1,061
-
$
TOTAL RECOMMENDED Savings:
$39,643
Cost:
$14,925
$23,570 464,664 $6,382 775 $8,966 1,352 $(-336) - $1,061 - $23,570
464,664
kWh
$6,382
775
kW-months/year
$8,966
1,352
MMBtu
$(-336)
-
$
$1,061
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes