IAC logo
IAC Assessment: MI0126
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MI0126
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Miami
Assessment Year 2006
Principal Product fire hose
NAICS 313220 - Narrow Fabric Mills and Schiffli Machine Embroidery
SIC 2241 - Narrow Fabric Mills
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 100,000
Annual Production 21,000 Thousand Feet
Production Hrs. Annual 7,350
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $82,701 1,461,900 kWh $0.06
Electricity Demand $29,877 3,711 kW-months/year $8.05
Electricity Fees $13,070 - $ -
Natural Gas $110,892 7,215 MMBtu $15.37
TOTAL ENERGY COSTS $236,540
RECOMMENDED SAVINGS* $77,484 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $77,484
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Primary Raw Material Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Primary Raw Material Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$17,617
Cost:
$16,000
- - - - $17,617 1,144 - - - - -
-
kWh
-
-
kW-months/year
$17,617
1,144
MMBtu
-
-
$
-
-
$
02: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$8,323
Cost:
$1,020
- - - - $8,323 541 - - - - -
-
kWh
-
-
kW-months/year
$8,323
541
MMBtu
-
-
$
-
-
$
03: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$6,331
Cost:
$212
$4,990 88,200 $861 144 - - - - $480 - $4,990
88,200
kWh
$861
144
kW-months/year
-
-
MMBtu
-
-
$
$480
-
$
04: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$1,497
Cost:
$1,750
- - - - $1,497 97 - - - - -
-
kWh
-
-
kW-months/year
$1,497
97
MMBtu
-
-
$
-
-
$
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,474
Cost:
-
$1,440 25,715 $34 4 - - - - - - $1,440
25,715
kWh
$34
4
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
06: 4.1310 MODIFY PROCESS TO REDUCE MATERIAL USE/COST Savings:
$42,242
Cost:
$140
$242 4,307 - - - - $42,000 - - - $242
4,307
kWh
-
-
kW-months/year
-
-
MMBtu
$42,000
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$77,484
Cost:
$19,122
$6,672 118,222 $895 148 $27,437 1,782 $42,000 - $480 - $6,672
118,222
kWh
$895
148
kW-months/year
$27,437
1,782
MMBtu
$42,000
-
$
$480
-
$
TOTAL IMPLEMENTED Savings:
$77,484
Cost:
$19,122
$6,672 118,222 $895 148 $27,437 1,782 $42,000 - $480 - $6,672
118,222
kWh
$895
148
kW-months/year
$27,437
1,782
MMBtu
$42,000
-
$
$480
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Primary Raw Material Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Primary Raw Material Ancillary Material Cost