IAC Assessment: MI0131
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MI0131
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Miami
Assessment Year 2006
Principal Product Glass
NAICS 332312 - Fabricated Structural Metal Manufacturing
SIC 3441 - Fabricated Structural Metal
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 100,000
Annual Production 17,000 Thousand Feet
Production Hrs. Annual 6,864
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $421,069 7,089,387 kWh $0.06
Electricity Demand $199,553 5,498 kW-months/year $36.30
Electricity Fees $123,253 - $ -
Natural Gas $318,333 16,647 MMBtu $19.12
TOTAL ENERGY COSTS $1,062,208
RECOMMENDED SAVINGS* $138,194 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $138,194
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$42,001
Cost:
$40,224
$39,512 3,165,581 $2,489 299 - - $39,512
3,165,581
kWh
$2,489
299
kW-months/year
-
-
MMBtu
02: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$41,642
Cost:
$6,538
- - - - $41,642 6,169 -
-
kWh
-
-
kW-months/year
$41,642
6,169
MMBtu
03: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$16,391
Cost:
$29,320
$15,312 16,104 $1,079 24 - - $15,312
16,104
kWh
$1,079
24
kW-months/year
-
-
MMBtu
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$15,321
Cost:
$1,074
$12,209 224,680 $3,112 374 - - $12,209
224,680
kWh
$3,112
374
kW-months/year
-
-
MMBtu
05: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$8,701
Cost:
$180
$6,779 126,720 $1,922 230 - - $6,779
126,720
kWh
$1,922
230
kW-months/year
-
-
MMBtu
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$5,552
Cost:
$216
$5,424 101,378 $128 15 - - $5,424
101,378
kWh
$128
15
kW-months/year
-
-
MMBtu
07: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$5,332
Cost:
-
$5,194 104,574 $138 17 - - $5,194
104,574
kWh
$138
17
kW-months/year
-
-
MMBtu
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$3,254
Cost:
$30
$2,638 48,556 $616 74 - - $2,638
48,556
kWh
$616
74
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$138,194
Cost:
$77,582
$87,068 3,787,593 $9,484 1,033 $41,642 6,169 $87,068
3,787,593
kWh
$9,484
1,033
kW-months/year
$41,642
6,169
MMBtu
TOTAL IMPLEMENTED Savings:
$138,194
Cost:
$77,582
$87,068 3,787,593 $9,484 1,033 $41,642 6,169 $87,068
3,787,593
kWh
$9,484
1,033
kW-months/year
$41,642
6,169
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas