Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Miami |
---|---|
Assessment Year | 2007 |
Principal Product | Beef |
NAICS | 311611 - Animal (except Poultry) Slaughtering |
SIC | 2011 - Meat Packing Plants |
Sales | $10,000,000-$50,000,000 |
# of Employees | 200 |
Plant Area (Sq.Ft.) | 50,000 |
Annual Production | 130,000 Units |
Production Hrs. Annual | 6,240 |
Location (State) | FL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $361,343 | 4,695,540 | kWh | $0.08 |
Electricity Demand | $33,256 | 9,813 | kW-months/year | $3.39 |
Electricity Fees | $32,470 | - | $ | - |
LPG | $161,747 | 11,521 | MMBtu | $14.04 |
TOTAL ENERGY COSTS | $588,816 | |||
RECOMMENDED SAVINGS* | $45,815 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $41,384 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | LPG | Electricity Usage | Electricity Demand | Natural Gas | LPG | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $20,581 Cost: $16,000 |
- | - | - | - | $20,581 | 1,468 | - | - |
- - kWh |
- - kW-months/year |
$20,581 1,468 MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $10,498 Cost: $1,750 |
- | - | - | - | - | - | $10,498 | 741 |
- - kWh |
- - kW-months/year |
- - MMBtu |
$10,498 741 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $10,305 Cost: $7,878 |
$9,326 | 208,546 | $979 | 287 | - | - | - | - |
$9,326 208,546 kWh |
$979 287 kW-months/year |
- - MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $3,950 Cost: $1,074 |
$3,950 | 176,082 | - | - | - | - | - | - |
$3,950 176,082 kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $481 Cost: $30 |
$376 | 5,367 | $105 | 644 | - | - | - | - |
$376 5,367 kWh |
$105 644 kW-months/year |
- - MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $45,815 Cost: $26,732 |
$13,652 | 389,995 | $1,084 | 931 | $20,581 | 1,468 | $10,498 | 741 | $13,652 389,995 kWh |
$1,084 931 kW-months/year |
$20,581 1,468 MMBtu |
$10,498 741 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $41,384 Cost: $25,628 |
$9,326 | 208,546 | $979 | 287 | $20,581 | 1,468 | $10,498 | 741 | $9,326 208,546 kWh |
$979 287 kW-months/year |
$20,581 1,468 MMBtu |
$10,498 741 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | LPG | Electricity Usage | Electricity Demand | Natural Gas | LPG |