IAC logo
IAC Assessment: MI0152
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MI0152
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Miami
Assessment Year 2007
Principal Product Trailer Truck Refrigerators
NAICS 423740 - Refrigeration Equipment and Supplies Merchant Wholesalers
SIC 5078 - Refrigeration Equipment And Supplies
Sales $10,000,000-$50,000,000
# of Employees 385
Plant Area (Sq.Ft.) 176,000
Annual Production 23,750 Pieces
Production Hrs. Annual 4,250
Location (State) PR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $826,619 5,907,990 kWh $0.14
Electricity Demand $147,153 19,091 kW-months/year $7.71
Electricity Fees $6,896 - $ -
TOTAL ENERGY COSTS $980,668
RECOMMENDED SAVINGS* $99,900 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $71,742
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes
$ kWh $ kW-months/year $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$31,769
Cost:
$1,074
$30,710 219,358 $1,059 110 - - $30,710
219,358
kWh
$1,059
110
kW-months/year
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$29,086
Cost:
$724
$28,075 200,537 $1,011 105 - - $28,075
200,537
kWh
$1,011
105
kW-months/year
-
-
$
03: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$18,314
Cost:
$4,000
$17,370 173,710 $944 98 - - $17,370
173,710
kWh
$944
98
kW-months/year
-
-
$
04: 4.8210 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$6,896
Cost:
$300
- - - - $6,896 - -
-
kWh
-
-
kW-months/year
$6,896
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$5,287
Cost:
$30
$4,419 31,567 $868 90 - - $4,419
31,567
kWh
$868
90
kW-months/year
-
-
$
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$4,557
Cost:
$30
$3,941 28,151 $616 64 - - $3,941
28,151
kWh
$616
64
kW-months/year
-
-
$
07: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT Savings:
$3,097
Cost:
$3,010
$2,644 15,648 $453 47 - - $2,644
15,648
kWh
$453
47
kW-months/year
-
-
$
08: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$894
Cost:
$510
$703 7,034 $191 20 - - $703
7,034
kWh
$191
20
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$99,900
Cost:
$9,678
$87,862 676,005 $5,142 534 $6,896 - $87,862
676,005
kWh
$5,142
534
kW-months/year
$6,896
-
$
TOTAL IMPLEMENTED Savings:
$71,742
Cost:
$5,618
$62,132 442,577 $2,714 282 $6,896 - $62,132
442,577
kWh
$2,714
282
kW-months/year
$6,896
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes