IAC logo
IAC Assessment: MI0161
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MI0161
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Miami
Assessment Year 2008
Principal Product Concrete Ready-Mix & Block
NAICS 327390 - Other Concrete Product Manufacturing
SIC 3272 - Concrete Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 75
Plant Area (Sq.Ft.) 1,000,000
Annual Production 108,300 Units
Production Hrs. Annual 2,700
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $181,423 2,489,040 kWh $0.07
Electricity Demand $84,634 11,639 kW-months/year $7.27
Electricity Fees $25,365 - $ -
Fuel Oil #1 $700,300 29,951 MMBtu $23.38
TOTAL ENERGY COSTS $991,722
RECOMMENDED SAVINGS* $125,289 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $40,696
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Fuel Oil #6 Electricity Usage Electricity Demand Fuel Oil #6
$ kWh $ kW-months/year $ MMBtu
01: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$32,580
Cost:
$89,078
$22,557 310,277 $10,023 115 - - $22,557
310,277
kWh
$10,023
115
kW-months/year
-
-
MMBtu
02: 2.8226 INCREASE EFFICIENCY OF TRUCKS Savings:
$27,036
Cost:
$41,580
- - - - $27,036 490 -
-
kWh
-
-
kW-months/year
$27,036
490
MMBtu
03: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$7,253
Cost:
$1,800
$4,868 67,005 $2,385 328 - - $4,868
67,005
kWh
$2,385
328
kW-months/year
-
-
MMBtu
04: 2.8226 INCREASE EFFICIENCY OF TRUCKS Savings:
$50,304
Cost:
$150,300
- - - - $50,304 2,153 -
-
kWh
-
-
kW-months/year
$50,304
2,153
MMBtu
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$6,779
Cost:
$720
$4,124 57,741 $2,655 252 - - $4,124
57,741
kWh
$2,655
252
kW-months/year
-
-
MMBtu
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,042
Cost:
$1,032
$925 12,674 $117 13 - - $925
12,674
kWh
$117
13
kW-months/year
-
-
MMBtu
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$295
Cost:
$24
$190 925 $105 13 - - $190
925
kWh
$105
13
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$125,289
Cost:
$284,534
$32,664 448,622 $15,285 721 $77,340 2,643 $32,664
448,622
kWh
$15,285
721
kW-months/year
$77,340
2,643
MMBtu
TOTAL IMPLEMENTED Savings:
$40,696
Cost:
$90,854
$27,796 381,617 $12,900 393 - - $27,796
381,617
kWh
$12,900
393
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Fuel Oil #6 Electricity Usage Electricity Demand Fuel Oil #6