IAC logo
IAC Assessment: MI0174
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MI0174
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Miami
Assessment Year 2008
Principal Product Windows
NAICS 332321 - Metal Window and Door Manufacturing
SIC 3442 - Metal Doors, Sash, And Trim
Sales $10,000,000-$50,000,000
# of Employees 435
Plant Area (Sq.Ft.) 350,000
Annual Production 25,000 Thousand Feet
Production Hrs. Annual 8,400
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $583,035 8,083,353 kWh $0.07
Electricity Demand $189,020 18,923 kW-months/year $9.99
Electricity Fees $120,576 - $ -
TOTAL ENERGY COSTS $892,631
RECOMMENDED SAVINGS* $302,439 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $77,354
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.2628 UTILIZE A LESS EXPENSIVE COOLING METHOD Savings:
$214,998
Cost:
$360,000
$183,590 2,295,079 $31,408 3,144 $183,590
2,295,079
kWh
$31,408
3,144
kW-months/year
02: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$32,694
Cost:
$2,000
$27,689 350,488 $5,005 501 $27,689
350,488
kWh
$5,005
501
kW-months/year
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$21,544
Cost:
$40
$18,219 228,397 $3,325 336 $18,219
228,397
kWh
$3,325
336
kW-months/year
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$19,041
Cost:
$1,210
$17,486 219,208 $1,555 156 $17,486
219,208
kWh
$1,555
156
kW-months/year
05: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT Savings:
$10,087
Cost:
$13,200
$8,798 110,295 $1,289 23 $8,798
110,295
kWh
$1,289
23
kW-months/year
06: 2.2523 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS Savings:
$4,075
Cost:
$322
$3,467 43,457 $608 61 $3,467
43,457
kWh
$608
61
kW-months/year
TOTAL RECOMMENDED Savings:
$302,439
Cost:
$376,772
$259,249 3,246,924 $43,190 4,221 $259,249
3,246,924
kWh
$43,190
4,221
kW-months/year
TOTAL IMPLEMENTED Savings:
$77,354
Cost:
$3,572
$66,861 841,550 $10,493 1,054 $66,861
841,550
kWh
$10,493
1,054
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand