IAC Assessment: MI0186
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MI0186
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Miami
Assessment Year 2009
Principal Product Blood testing equipment
NAICS 334510 - Electromedical and Electrotherapeutic Apparatus Manufacturing
SIC 3845 - Electromedical Equipment
Sales $50,000,000-$100,000,000
# of Employees 475
Plant Area (Sq.Ft.) 500,000
Annual Production 125,000 Units
Production Hrs. Annual 6,732
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,424,057 16,453,831 kWh $0.09
Electricity Demand $328,603 59,073 kW-months/year $5.56
Electricity Fees $289,288 - $ -
TOTAL ENERGY COSTS $2,041,948
RECOMMENDED SAVINGS* $431,504 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $327,855
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.2628 UTILIZE A LESS EXPENSIVE COOLING METHOD Savings:
$160,282
Cost:
-
$142,612 1,782,634 $17,670 3,178 $142,612
1,782,634
kWh
$17,670
3,178
kW-months/year
02: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$110,625
Cost:
$4,000
$98,432 1,230,403 $12,193 2,193 $98,432
1,230,403
kWh
$12,193
2,193
kW-months/year
03: 2.2628 UTILIZE A LESS EXPENSIVE COOLING METHOD Savings:
$76,266
Cost:
$28,000
$67,859 848,232 $8,407 1,512 $67,859
848,232
kWh
$8,407
1,512
kW-months/year
04: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$56,948
Cost:
$10,000
$51,948 618,836 $5,000 1,103 $51,948
618,836
kWh
$5,000
1,103
kW-months/year
05: 2.7425 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD Savings:
$24,293
Cost:
$1,600
$21,615 270,192 $2,678 482 $21,615
270,192
kWh
$2,678
482
kW-months/year
06: 2.7122 DISCONNECT BALLASTS Savings:
$3,090
Cost:
$900
$2,750 34,380 $340 61 $2,750
34,380
kWh
$340
61
kW-months/year
TOTAL RECOMMENDED Savings:
$431,504
Cost:
$44,500
$385,216 4,784,677 $46,288 8,529 $385,216
4,784,677
kWh
$46,288
8,529
kW-months/year
TOTAL IMPLEMENTED Savings:
$327,855
Cost:
$14,000
$292,992 3,631,873 $34,863 6,474 $292,992
3,631,873
kWh
$34,863
6,474
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand