IAC Assessment: MI0216
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MI0216
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Miami
Assessment Year 2012
Principal Product Molded Products
NAICS 326199 - All Other Plastics Product Manufacturing
SIC 3089 - Plastics Products, Nec
Sales $5,000,000-$10,000,000
# of Employees 31
Plant Area (Sq.Ft.) 22,300
Annual Production 300,000 Pieces
Production Hrs. Annual 4,160
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $53,554 928,883 kWh $0.06
Electricity Demand $31,238 3,400 kW-months/year $9.19
Electricity Fees $14,223 - $ -
TOTAL ENERGY COSTS $99,015
RECOMMENDED SAVINGS* $21,771 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $16,464
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$7,554
Cost:
$8,000
$5,542 75,920 $2,012 219 $5,542
75,920
kWh
$2,012
219
kW-months/year
02: 2.7425 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD Savings:
$5,307
Cost:
$8,856
$3,892 53,311 $1,415 154 $3,892
53,311
kWh
$1,415
154
kW-months/year
03: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$3,759
Cost:
$1,592
$2,758 37,781 $1,001 109 $2,758
37,781
kWh
$1,001
109
kW-months/year
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,170
Cost:
$1,320
$1,591 21,795 $579 63 $1,591
21,795
kWh
$579
63
kW-months/year
05: 2.7245 USE DIRECT AIR SUPPLY TO EXHAUST HOODS Savings:
$2,128
Cost:
$500
$1,558 21,345 $570 62 $1,558
21,345
kWh
$570
62
kW-months/year
06: 2.7496 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE Savings:
$853
Cost:
$3,656
$623 8,530 $230 25 $623
8,530
kWh
$230
25
kW-months/year
TOTAL RECOMMENDED Savings:
$21,771
Cost:
$23,924
$15,964 218,682 $5,807 632 $15,964
218,682
kWh
$5,807
632
kW-months/year
TOTAL IMPLEMENTED Savings:
$16,464
Cost:
$15,068
$12,072 165,371 $4,392 478 $12,072
165,371
kWh
$4,392
478
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand