IAC Assessment: MI0237
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MI0237
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Miami
Assessment Year 2013
Principal Product Photographic and Optical Equipment/supplies Manufacturing
NAICS 333314 - Optical Instrument and Lens Manufacturing
SIC 3827 - Optical Instruments And Lenses
Sales $10,000,000-$50,000,000
# of Employees 85
Plant Area (Sq.Ft.) 97,000
Annual Production 1,000 Bushels
Production Hrs. Annual 6,240
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $221,612 2,678,500 kWh $0.08
Electricity Demand $29,342 6,162 kW-months/year $4.76
Electricity Fees $38,406 - $ -
TOTAL ENERGY COSTS $289,360
RECOMMENDED SAVINGS* $42,023 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $36,241
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$22,474
Cost:
$10,160
$20,241 243,870 $2,233 469 $20,241
243,870
kWh
$2,233
469
kW-months/year
02: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$6,857
Cost:
$80
$6,795 81,870 $62 13 $6,795
81,870
kWh
$62
13
kW-months/year
03: 2.7496 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE Savings:
$5,143
Cost:
$2,188
$4,632 55,812 $511 107 $4,632
55,812
kWh
$511
107
kW-months/year
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,086
Cost:
$80
$1,870 22,537 $216 46 $1,870
22,537
kWh
$216
46
kW-months/year
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,565
Cost:
$1,660
$1,470 17,715 $95 20 $1,470
17,715
kWh
$95
20
kW-months/year
06: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$1,104
Cost:
$2,406
$994 11,983 $110 23 $994
11,983
kWh
$110
23
kW-months/year
07: 2.7496 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE Savings:
$1,045
Cost:
$40
$940 11,326 $105 22 $940
11,326
kWh
$105
22
kW-months/year
08: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$714
Cost:
$205
$643 7,743 $71 15 $643
7,743
kWh
$71
15
kW-months/year
09: 2.7496 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE Savings:
$639
Cost:
$1,240
$577 6,947 $62 13 $577
6,947
kWh
$62
13
kW-months/year
10: 2.7496 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE Savings:
$396
Cost:
$1,880
$358 4,315 $38 8 $358
4,315
kWh
$38
8
kW-months/year
TOTAL RECOMMENDED Savings:
$42,023
Cost:
$19,939
$38,520 464,118 $3,503 736 $38,520
464,118
kWh
$3,503
736
kW-months/year
TOTAL IMPLEMENTED Savings:
$36,241
Cost:
$16,511
$33,311 401,359 $2,930 616 $33,311
401,359
kWh
$2,930
616
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand