Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Miami
Assessment Year 2013
Principal Product Pharmacutical
NAICS 325412 - Pharmaceutical Preparation Manufacturing
SIC 2834 - Pharmaceutical Preparations
Sales $10,000,000-$50,000,000
# of Employees 92
Plant Area (Sq.Ft.) 240,000
Annual Production 100,000 Pieces
Production Hrs. Annual 8,736
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,044,600 25,270,687 kWh $0.04
Electricity Demand $592,971 43,609 kW-months/year $13.60
Electricity Fees $250,878 - $ -
Natural Gas $369,797 68,093 MMBtu $5.43
TOTAL ENERGY COSTS $2,258,245
RECOMMENDED SAVINGS* $226,977 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $145,423
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$61,014
Cost:
$80
$41,920 1,022,437 $19,094 1,404 - - $41,920
1,022,437
kWh
$19,094
1,404
kW-months/year
-
-
MMBtu
02: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$34,598
Cost:
$56,000
- - - - $34,598 6,302 -
-
kWh
-
-
kW-months/year
$34,598
6,302
MMBtu
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$27,781
Cost:
$21,720
$19,085 465,491 $8,696 640 - - $19,085
465,491
kWh
$8,696
640
kW-months/year
-
-
MMBtu
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$23,367
Cost:
$1,660
$5,619 137,064 $17,748 1,305 - - $5,619
137,064
kWh
$17,748
1,305
kW-months/year
-
-
MMBtu
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$17,954
Cost:
$80
$7,550 184,152 $10,404 765 - - $7,550
184,152
kWh
$10,404
765
kW-months/year
-
-
MMBtu
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$14,391
Cost:
$14,480
$9,886 241,119 $4,505 331 - - $9,886
241,119
kWh
$4,505
331
kW-months/year
-
-
MMBtu
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$12,902
Cost:
$799
$8,863 216,180 $4,039 297 - - $8,863
216,180
kWh
$4,039
297
kW-months/year
-
-
MMBtu
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$10,576
Cost:
$22,610
$5,530 134,884 $5,046 371 - - $5,530
134,884
kWh
$5,046
371
kW-months/year
-
-
MMBtu
09: 2.2511 INSULATE BARE EQUIPMENT Savings:
$6,625
Cost:
$4,623
- - - - $6,625 1,220 -
-
kWh
-
-
kW-months/year
$6,625
1,220
MMBtu
10: 2.2511 INSULATE BARE EQUIPMENT Savings:
$5,765
Cost:
$3,960
- - - - $5,765 1,050 -
-
kWh
-
-
kW-months/year
$5,765
1,050
MMBtu
11: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$5,219
Cost:
$1,575
$3,585 87,444 $1,634 120 - - $3,585
87,444
kWh
$1,634
120
kW-months/year
-
-
MMBtu
12: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,552
Cost:
$3,840
$2,440 59,506 $1,112 82 - - $2,440
59,506
kWh
$1,112
82
kW-months/year
-
-
MMBtu
13: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,233
Cost:
$17,980
$2,221 54,163 $1,012 74 - - $2,221
54,163
kWh
$1,012
74
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$226,977
Cost:
$149,407
$106,699 2,602,440 $73,290 5,389 $46,988 8,572 $106,699
2,602,440
kWh
$73,290
5,389
kW-months/year
$46,988
8,572
MMBtu
TOTAL IMPLEMENTED Savings:
$145,423
Cost:
$41,284
$82,953 2,023,280 $62,470 4,593 - - $82,953
2,023,280
kWh
$62,470
4,593
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas