IAC logo
IAC Assessment: MI0319
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MI0319
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Miami
Assessment Year 2017
Principal Product Pharmaceuticals
NAICS 325412 - Pharmaceutical Preparation Manufacturing
SIC 2834 - Pharmaceutical Preparations
Sales $100,000,000-$500,000,000
# of Employees 240
Plant Area (Sq.Ft.) 580,000
Annual Production 5,200,000,000 Units
Production Hrs. Annual 8,760
Location (State) PR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $4,434,148 28,882,368 kWh $0.15
Electricity Demand $462,677 51,473 kW-months/year $8.99
Electricity Fees $35,306 - $ -
TOTAL ENERGY COSTS $4,932,131
RECOMMENDED SAVINGS* $736,359 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $417,460
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Administrative Changes Electricity Usage Electricity Demand Electricity Fees Administrative Changes
$ kWh $ kW-months/year $ $ $ $
01: 2.7425 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD Savings:
$288,813
Cost:
$48,000
$267,450 1,736,686 $21,363 2,379 - - - - $267,450
1,736,686
kWh
$21,363
2,379
kW-months/year
-
-
$
-
-
$
02: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$172,588
Cost:
$249,599
- - $172,588 19,200 - - - - -
-
kWh
$172,588
19,200
kW-months/year
-
-
$
-
-
$
03: 2.4321 UPGRADE OBSOLETE EQUIPMENT Savings:
$120,000
Cost:
$42,000
- - - - - - $120,000 - -
-
kWh
-
-
kW-months/year
-
-
$
$120,000
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$84,550
Cost:
$59,400
$78,296 508,417 $6,254 696 - - - - $78,296
508,417
kWh
$6,254
696
kW-months/year
-
-
$
-
-
$
05: 2.8123 PAY UTILITY BILLS ON TIME Savings:
$29,840
Cost:
-
- - - - $29,840 - - - -
-
kWh
-
-
kW-months/year
$29,840
-
$
-
-
$
06: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$26,311
Cost:
$12,000
- - - - - - $26,311 - -
-
kWh
-
-
kW-months/year
-
-
$
$26,311
-
$
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$14,257
Cost:
$1,670
$11,740 76,236 $2,517 281 - - - - $11,740
76,236
kWh
$2,517
281
kW-months/year
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$736,359
Cost:
$412,669
$357,486 2,321,339 $202,722 22,556 $29,840 - $146,311 - $357,486
2,321,339
kWh
$202,722
22,556
kW-months/year
$29,840
-
$
$146,311
-
$
TOTAL IMPLEMENTED Savings:
$417,460
Cost:
$109,070
$357,486 2,321,339 $30,134 3,356 $29,840 - - - $357,486
2,321,339
kWh
$30,134
3,356
kW-months/year
$29,840
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Administrative Changes Electricity Usage Electricity Demand Electricity Fees Administrative Changes