Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Miami |
---|---|
Assessment Year | 2019 |
Principal Product | Botteled and canned soft drinks |
NAICS | 312111 - Soft Drink Manufacturing |
SIC | 2086 - Bottled And Canned Soft Drinks |
Sales | $100,000,000-$500,000,000 |
# of Employees | 300 |
Plant Area (Sq.Ft.) | 311,000 |
Annual Production | 32,000,000 Pieces |
Production Hrs. Annual | 8,736 |
Location (State) | FL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $1,314,944 | 20,376,737 | kWh | $0.06 |
Electricity Demand | $461,125 | 44,670 | kW-months/year | $10.32 |
Electricity Fees | $162,903 | - | $ | - |
Natural Gas | $165,383 | 29,552 | MMBtu | $5.60 |
Fuel Oil #2 | $126,055 | 5,737 | MMBtu | $21.97 |
TOTAL ENERGY COSTS | $2,230,410 | |||
RECOMMENDED SAVINGS* | $567,394 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $394,442 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Fuel Oil #2 | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Fuel Oil #2 | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES |
Savings: $234,952 Cost: $172,151 |
$192,619 | 2,986,347 | $42,333 | 4,102 | - | - | - | - | - | - |
$192,619 2,986,347 kWh |
$42,333 4,102 kW-months/year |
- - MMBtu |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $137,608 Cost: $23,779 |
$112,819 | 1,749,131 | $24,789 | 2,402 | - | - | - | - | - | - |
$112,819 1,749,131 kWh |
$24,789 2,402 kW-months/year |
- - MMBtu |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2696 USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS |
Savings: $65,500 Cost: $142,400 |
$33,025 | 512,011 | $7,544 | 731 | $24,931 | 4,452 | - | - | - | - |
$33,025 512,011 kWh |
$7,544 731 kW-months/year |
$24,931 4,452 MMBtu |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $36,067 Cost: $25,990 |
$17,107 | 265,228 | $3,756 | 364 | $15,204 | 2,715 | - | - | - | - |
$17,107 265,228 kWh |
$3,756 364 kW-months/year |
$15,204 2,715 MMBtu |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7425 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD |
Savings: $21,816 Cost: $46,090 |
$10,278 | 159,348 | $11,538 | 1,118 | - | - | - | - | - | - |
$10,278 159,348 kWh |
$11,538 1,118 kW-months/year |
- - MMBtu |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.8223 ADD AIR SHIELDS TO TRUCKS TO INCREASE FUEL MILEAGE |
Savings: $18,916 Cost: $13,100 |
- | - | - | - | - | - | $18,916 | 861 | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$18,916 861 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $18,627 Cost: $1,126 |
$15,273 | 236,785 | $3,354 | 325 | - | - | - | - | - | - |
$15,273 236,785 kWh |
$3,354 325 kW-months/year |
- - MMBtu |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $12,352 Cost: $3,860 |
$10,123 | 156,943 | $2,229 | 216 | - | - | - | - | - | - |
$10,123 156,943 kWh |
$2,229 216 kW-months/year |
- - MMBtu |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $8,638 Cost: $200 |
$7,080 | 109,772 | $1,558 | 151 | - | - | - | - | - | - |
$7,080 109,772 kWh |
$1,558 151 kW-months/year |
- - MMBtu |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.8226 INCREASE EFFICIENCY OF TRUCKS |
Savings: $6,123 Cost: $5,800 |
- | - | - | - | - | - | $2,373 | 108 | $3,750 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$2,373 108 MMBtu |
$3,750 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS |
Savings: $3,540 Cost: $6,160 |
$2,880 | 44,656 | $660 | 64 | - | - | - | - | - | - |
$2,880 44,656 kWh |
$660 64 kW-months/year |
- - MMBtu |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 2.6127 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT |
Savings: $2,203 Cost: $410 |
$1,790 | 27,759 | $413 | 40 | - | - | - | - | - | - |
$1,790 27,759 kWh |
$413 40 kW-months/year |
- - MMBtu |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
13: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $1,052 Cost: $80 |
$804 | 12,464 | $248 | 24 | - | - | - | - | - | - |
$804 12,464 kWh |
$248 24 kW-months/year |
- - MMBtu |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $567,394 Cost: $441,146 |
$403,798 | 6,260,444 | $98,422 | 9,537 | $40,135 | 7,167 | $21,289 | 969 | $3,750 | - | $403,798 6,260,444 kWh |
$98,422 9,537 kW-months/year |
$40,135 7,167 MMBtu |
$21,289 969 MMBtu |
$3,750 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $394,442 Cost: $197,546 |
$323,305 | 5,012,486 | $71,137 | 6,893 | - | - | - | - | - | - | $323,305 5,012,486 kWh |
$71,137 6,893 kW-months/year |
- - MMBtu |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Fuel Oil #2 | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Fuel Oil #2 | Administrative Changes |