IAC logo
IAC Assessment: MI0369
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MI0369
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Miami
Assessment Year 2020
Principal Product Adhesives and Sealants
NAICS 325520 - Adhesive Manufacturing
SIC 2869 - Industrial Organic Chemicals, Nec
Sales $10,000,000-$50,000,000
# of Employees 30
Plant Area (Sq.Ft.) 100,000
Annual Production 1,500 Thousand Gallons
Production Hrs. Annual 4,290
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $72,729 879,648 kWh $0.08
Electricity Demand $46,101 7,092 kW-months/year $6.50
Electricity Fees $3,938 - $ -
TOTAL ENERGY COSTS $122,768
RECOMMENDED SAVINGS* $25,734 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $21,480
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees
$ kWh $ kW-months/year $ $
01: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$11,259
Cost:
$580
$10,167 122,490 $1,092 168 - - $10,167
122,490
kWh
$1,092
168
kW-months/year
-
-
$
02: 2.7133 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE Savings:
$6,954
Cost:
$7,492
$6,954 83,786 - - - - $6,954
83,786
kWh
-
-
kW-months/year
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,267
Cost:
$1,980
$2,708 32,621 $559 86 - - $2,708
32,621
kWh
$559
86
kW-months/year
-
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$3,265
Cost:
$7,389
$2,712 32,669 $553 85 - - $2,712
32,669
kWh
$553
85
kW-months/year
-
-
$
05: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$551
Cost:
$280
$551 6,639 - - - - $551
6,639
kWh
-
-
kW-months/year
-
-
$
06: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$438
Cost:
-
- - - - $438 - -
-
kWh
-
-
kW-months/year
$438
-
$
TOTAL RECOMMENDED Savings:
$25,734
Cost:
$17,721
$23,092 278,205 $2,204 339 $438 - $23,092
278,205
kWh
$2,204
339
kW-months/year
$438
-
$
TOTAL IMPLEMENTED Savings:
$21,480
Cost:
$10,052
$19,829 238,897 $1,651 254 - - $19,829
238,897
kWh
$1,651
254
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees